- document
-
Hoogendorp, G. (author)The extension of the Dutch 380 kV high voltage grid is necessary in order to guarantee security of electricity supply to the consumers. To achieve this extension, there are two new 380 kV connections under construction in the Randstad area, a densely populated area in the western part of the Netherlands. In these 380 kV connections, underground...doctoral thesis 2016
- document
-
De Regt, J.J. (author), Hoogendorp, G. (author), Wagenaars, P. (author), Wouters, P.A.A.F. (author), Popov, M. (author), Van der Sluis, L. (author), Steennis, E.F. (author)Transients from lightning strikes can enter underground cables at overhead line to power cable transitions. Possible overvoltages on these surges at cross-bonding connections of the cable screens are of major concern. A model is developed for modelling overvoltages from transient signal propagation through a combined cross-bonding cable and box....journal article 2014
- document
-
Hoogendorp, G. (author), Popov, M. (author), Van der Sluis, L. (author)Transmission of electric energy at high voltage levels is mainly performed by overhead lines. Nowadays, an increasing amount of power grid operators are replacing overhead transmission lines by underground cables. Cable presence in power systems may have consequences for the behavior of the total system, since cables have much larger capacitance...conference paper 2013
- document
-
Hoogendorp, G. (author), Popov, M. (author), Van der Sluis, L. (author)This letter deals with the hybrid modeling of transformers and the determination of interturn voltage distribution in transformers with layer-type windings. The hybrid model uses a combination of a multiconductor transmission-line model and a single transmission-line model. The good agreement between computed and measured voltage waveforms shows...journal article 2009