Searched for: %2520
(1 - 1 of 1)
document
Mulder, J. (author)
During the construction of a station of the north south line in Amsterdam a leak in the diaphragm wall lead to severe damage to adjacent buildings. The leak consisted of a clay deposit caught near the joint. Until the excavation reached the level of the deposit, the deposit acted as a seal. After the excavation it started to leak and eventually...
master thesis 2011