Searched for: %2520
(1 - 2 of 2)
document
Lantsoght, E.O.L. (author), van der Veen, C. (author), De Boer, Ane (author), van der Ham, Herbert (author)
In 1997, the Second Stichtse Bridge was built in the Netherlands using the balanced cantilever method. The use of high-strength concrete was proposed. At that time, the long-term behaviour of this material was not known, and no code provisions were applicable. Therefore, it was proposed to monitor the material behaviour and the deflections of...
journal article 2018
document
Bakker, K.J. (author), De Boer, F. (author), Admiraal, J.B.M. (author), Van Jaarsveld, E.P. (author)
Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be given. The Second Heinenoord Tunnel has...
journal article 1999