Searched for: author%253A%2522Besinovic%252C%2520Nikola%2522
(1 - 5 of 5)
document
van Hövell, Madeleine E.M.A. (author), Goverde, R.M.P. (author), Bešinović, Nikola (author), de Weerdt, M.M. (author)
Trains consist of one or more railway vehicles called rolling stock, which need interior and exterior cleaning and small technical checks on a daily basis. These services are executed at service locations (SLs). Scheduling rolling stock servicing tasks during an operational day is important to guarantee the fulfilment of servicing deadlines....
journal article 2022
document
Tang, Ruifan (author), De Donato, Lorenzo (author), Bešinović, Nikola (author), Flammini, Francesco (author), Goverde, R.M.P. (author), Lin, Zhiyuan (author), Liu, Ronghui (author), Tang, Tianli (author), Vittorini, Valeria (author), Wang, Z. (author)
Nowadays it is widely accepted that Artificial Intelligence (AI) is significantly influencing a large number of domains, including railways. In this paper, we present a systematic literature review of the current state-of-the-art of AI in railway transport. In particular, we analysed and discussed papers from a holistic railway perspective,...
review 2022
document
Zomer, Jordi (author), Bešinović, Nikola (author), de Weerdt, M.M. (author), Goverde, R.M.P. (author)
Due to increasing railway use, the capacity at railway yards and maintenance locations is becoming limiting to accommodate existing rolling stock. To reduce capacity issues at maintenance locations during nighttime, railway undertakings consider performing more daytime maintenance, but the choice at which locations personnel needs to be...
journal article 2021
document
Trepat Borecka, Jacob (author), Bešinović, Nikola (author)
Highly utilized railway networks require regular infrastructure maintenance. Different track sections often need to be closed for entire days to carry out engineering works, which makes the regular timetables no longer feasible and thus adjusted railway services and temporary alternative services need to be planned. We introduce the...
journal article 2021
document
Van Aken, Sander (author), Bešinović, Nikola (author), Goverde, R.M.P. (author)
During infrastructure maintenance possessions, commonly not all trains can operate, and the original timetable may have to be adjusted accordingly. To deliver the best service to passengers, operators have to coordinate adjustment measures dealing with multiple possessions at the network level. In this paper, we consider the Train Timetable...
journal article 2017
Searched for: author%253A%2522Besinovic%252C%2520Nikola%2522
(1 - 5 of 5)