Searched for: author%3A%22Karamperidou%2C+A.%22
(1 - 2 of 2)
document
Karamperidou, A. (author)
In cases where the sheet pilling is allowed, when great retaining heights have to be achieved a combined quay wall structure is normally used. This structure consists of a sheet pile wall, a relieving platform, an anchor and a pile foundation system. The content of the present MSc thesis is divided into two major parts. The first part (Part A0...
master thesis 2008
document
Van Bemmel, M. (author), Bénit, M. (author), Croonen, K. (author), Mulders, P. (author), Hiemstra, B. (author), Hillen, M. (author), Hoyng, C. (author), Karamperidou, A. (author), Schoutens, P. (author), Sluijsmans, R. (author), Smits, M. (author), Valk, A. (author), Vanidis, G. (author), Verduin, F. (author), De Winter, R. (author), Vanlishout, V. (author)
From Sunday September 30th until October 7th, a group of 16 Hydraulic engineering students and one teacher went to Bulgaria. Three Bulgarian students and two Bulgarian teachers from Sofia University of Architecture, Civil Engineering and Geology joined them at their arrival in Varna. The students were given an assignment concerning the...
student report 2007