Searched for: contributor%3A%22Ligteringen%2C+H.+%28mentor%29%22
(1 - 2 of 2)
document
Boeyinga, J. (author)
The workability of floating construction equipment is one of the elements in the construction phasing of the design of the Ashdod port extension in the south of Israel by DHV Consultancy and Engineering. Waves play an important role in the workability of floating equipment, since they induce motions to floating equipment with the possibility of...
master thesis 2010
document
Kooy, M. (author)
To support cost calculations for tendering a pipe lay project, the influence of weather conditions has to be incorporated by applying workability predictions for the pipe lay vessel. When assuming constant good weather conditions it is possible to accurately determine the duration of an offshore pipe lay project. In practice however, changing...
master thesis 2004