Searched for: department%3A%22Hydraulic%22
(1 - 3 of 3)
document
Van den Akker, P. (author), Brands, M. (author), Buijs, W. (author), Hamilton, L. (author)
When the new locks of the Panama Canal are finished in 2015 Post Panamax vessels are able to sail through the Panama Canal. This will increase the container traffic intensity through the Caribbean. China Harbour Engineering Company (CHEC) wants to anticipate on this expansion of the Panama Canal by investing in a US$1.5 billion transshipment...
student report 2013
document
Kerssens, P. (author), Verreijken, K. (author), Vermerris, P. (author), Wijs, J. (author)
Student project report, in cooperation with Smith-Warner International Ltd. (SWIL), Kingston, Jamaica. At this moment the shipping channels in Kingston Harbour, Jamaica, slowly accrete. When the harbour is expanded, the local and global sediment transport is likely to change. During this project it is investigated whether these changes are...
student report 2012
document
Ten Ham, D. (author), Henrotte, J. (author), Kraaijeveld, R. (author), Milosevic, M. (author), Smit, P. (author)
The ongoing erosion of the Negril Beach has become worse the past decade. In most places along the coast line, the beach will be gone in approximately 10 years. This will result in a major decrease of incomes that are made by the local tourist sector. To prevent the erosion this study has been performed to find a feasible and affordable solution...
student report 2006