Searched for: subject%253A%2522uncertainty%2522
(1 - 3 of 3)
document
Blankenzee, Regino (author)
The planning of railway operations is a very complex process, in which timetables and other logistical plans need to be both reliable and robust to effectively prevent and cope with disturbances. However, research in the robustness of initial stabling plans, designed in an earlier planning phase, during the following planning phases, has been...
master thesis 2023
document
Papadogeorgos, Yannis (author)
The Dutch container glass industry is an energy- and capital-intensive industry which accounts for about 350 kt of carbon dioxide (CO2) emissions on an annual basis. The fluctuating energy prices during the past decades as well as the implementation of the European Emission trading scheme (ETS) are pushing towards the deep decarbonisation of...
master thesis 2019
document
Broers, B.W.L. (author)
After the flood of 1993 and 1995 in the Netherlands, flood risks in Limburg became an important discussion. Each flood defence system along the river Meuse needs to be provided with a safety level with an annual failure probability of 1/250. In the nearby future a new safety philosophy will be introduced, entailing new safety norms and...
master thesis 2015