- document
-
Groenenberg, D. (author), Beijnen, L.F.E. (author)Increase in wind- and solar parks complicate grid stability due to their deterministic behaviour. ENTSO-E established requirements for generators for grid connection in Europe. A requirement is to have active- and reactive power control that implements a power setpoint given by the transmission system operator. This thesis describes the design...bachelor thesis 2020
- document
-
Groenenberg, E.O.K. (author)The Project Experiencing gorillas in the cloud is a graduation project that aims ‘to create a product for the Apenheul that enhances the user experience of a visit to the park using sensor data’. In Apenheul a network of sensors has been placed around the gorilla island, constantly gathering data about the gorillas. Gorillas In the Cloud was...master thesis 2013