Searched for: subject%3A%22Testing%22
(1 - 1 of 1)
document
De Lange, D.A. (author)
An increase over time in bearing capacity of displacement piles is often found in the field. This phenomenon is called pile set-up. The increase is predominantly caused by an increase in shaft resistance and is observed even until 1000 days after installation. In the Dutch situation, a proposed tightening of the design standard for pile...
master thesis 2013