Searched for: subject%3A%22armour%255C%252Bunits%22
(1 - 10 of 10)
document
Hofland, Bas (author), Houtzager, Daan (author), Caldera, Ganga (author), Antonini, A. (author), van Gent, M.R.A. (author), Bakker, Pieter (author), van der Lem, Cock (author)
Single layer randomly placed armour units are used in many rubble mound breakwaters around the world. For these armour layers first extraction of units starts at high loads and can then progress quickly. Before the first extraction of a unit, typically no quantitative description of damage can be given. But additional to extraction, breakage of...
journal article 2023
document
Hofland, Bas (author), van Gent, Marcel (author)
A method to quantify, analyse, and present the settlement of single-layer concrete armour layers of coastal structures is presented. The use of the image processing technique for settlement analysis is discussed based on various modelling<br/>studies performed over the years. The accuracy of the technique is assessed, and the application of the...
conference paper 2016
document
De Rover, R. (author), Verhagen, H.J. (author), Van den Berge, A. (author), Reedijk, B. (author)
The effect of single layer interlocking armour unit breakage on the hydraulic armour layer stability and potential damage progression is addressed in this paper. A 2-dimensional scale model of a rubble mound breakwater with an armour layer consisting of Xbloc armour units was tested. The residual armour layer stability with broken units was...
conference paper 2008
document
Kuiper, C. (author), Van Gent, M.R.A. (author)
De Bouwdienst van Rijkswaterstaat heeft WL Delft Hydraulics opdracht gegeven voor het uitvoeren van 2D fysisch modelonderzoek ten behoeve van een mogelijke renovatie van de havendammen van IJmuiden. Het betreft enerzijds modelonderzoek om meer inzicht te verkrijgen in mogelijk optredende schademechanismen bij de huidige constructie (Proevenserie...
report 2006
document
Verhagen, H.J. (author), D' Angremond, K. (author), Van der Vliet, K. (author)
Recent research has shown that it is possible to use concrete cubes as a single armour layer on breakwaters. However, this is only possible in case a placing density of at least 70 % is achieved. In lab-tests it is no problem to place cubes with this density, however it is questionable if such a placing density can be achieved in prototype...
conference paper 2002
document
Burcharth, H.F. (author)
The slender, complex types of armour units, such as Tetrapods and Dolosse are widely used for rubble mound breakwaters. Many of the recent failures of such structures were caused by unforeseen early breakage of the units, thus revealing an inbalance between the strength (structural integrity) of the units and the hydraulic stability (resistance...
report 1995
document
De Haan, W. (author)
The computation of the optimum rubble-mound breakwater crosssection is executed on a micro-computer. The RUMBA computer package consists of two main parts: the optimization process is executed by a Turbo Pascal programme, the second part consists of editing functions written in AutoLISP. AutoLISP is the programming language within AutoCAD. The...
report 1989
document
Massie, W.W. (author)
General considerations, types of breakwaters, rubble mound breakwaters, wave run-up and overtopping, construction materials, armor computations, te core, filter and toe constructions, rubble mound breakwater construction, optimum design, example, monolithic breakwater, construction materials, wave foreces on vertical walls, monolithic breakwater...
lecture notes 1986
document
Juul Jensen, O. (author)
Overview of failure mechanisms of rubble mound breakwaters of various types.
report 1984
document
Iribarren Cavanilles, R. (author)
Development of a formula for the stability of rubble mound breakwaters.
report 1953
Searched for: subject%3A%22armour%255C%252Bunits%22
(1 - 10 of 10)