Searched for: subject%3A%22risk%22
(1 - 18 of 18)
document
Geng, S. (author), Yang, M. (author), Mitici, Mihaela (author), Liu, Sifeng (author)
System resilience characterizes the capability of maintaining the required functionality under disruptions, which is of great significance in evaluating the productivity and safety of complex engineered systems. Although most studies conduct resilience assessment from qualitative and quantitative perspectives, system functionality that reflects...
journal article 2023
document
Liu, Lian (author), Bricker, J.D. (author), Hu, Chao (author)
Early initial impoundment can generate additional revenue but bring more flood risk in late-stage construction diversion. In view of the possible flood risk and catastrophic consequences caused by high dam failures induced by early impoundment, a comprehensive assessment is proposed. Taking the Lianghekou high rockfill dam on the Yalong River...
journal article 2023
document
Chen, Xing lin (author), Lin, Wei dong (author), Liu, Chun xiang (author), Yang, Fu qiang (author), Guo, Yong (author), Li, Xin (author), Yuan, S. (author), Reniers, G.L.L.M.E. (author)
Natural gas pipeline construction is developing rapidly worldwide to meet the needs of international and domestic energy transportation. Meanwhile, leakage accidents occur to natural gas pipelines frequently due to mechanical failure, personal operation errors, etc., and induce huge economic property loss, environmental damages, and even...
journal article 2023
document
Liu, H. (author)
In the Geomatics domain, a point cloud refers to a data set which records the coordinates and other attributes of a huge number of points. Conceptually, each of these attributes can be regarded as a dimension, representing a specific type of information. Apart from routinely concerned spatio-temporal dimensions for coordinates, other dimensions...
doctoral thesis 2022
document
Xiang, Pengcheng (author), Zhang, Qianman (author), Jiang, Qiuyan (author), Liu, Z. (author)
Operation risk (OR) has affected sustainable development of urban rail transit (URT) public–private partnership (PPP) projects in China. Balanced distribution of operational risks among stakeholders (the public, government, and private companies) involved in URT PPP projects can maximize overall profit. Quantitative analysis of operational...
journal article 2022
document
Liang, Benbu (author), Xie, Kefan (author), van der Wal, C.N. (author), Liu, Jia (author)
In order to explore impacts of crowd intervention strategies on indoor respiratory exposure risks during major pandemics, a variety of crowd motion scenarios were established in general indoor conditions based on improved pedestrian dynamics model and respiratory infection probability model. Then, multi-agent simulation technology was utilized...
journal article 2022
document
Li, Yuanli (author), Xiang, Pengcheng (author), You, Kairui (author), Guo, Jin (author), Liu, Z. (author), Ren, Hong (author)
Mega infrastructure projects (MIPs) have become increasingly important to the realization of sustainable development in China. Sustainable development is a process of dynamic balance, and coordinating the triple bottom line (the environmental, social, and economic dimensions) will enable more sustainable development of MIPs. However, previous...
journal article 2021
document
Xue, Yutong (author), Xiang, Pengcheng (author), Jia, Fuyuan (author), Liu, Z. (author)
Due to their characteristics and multiple objectives, high-speed rail (HSR) projects carry more complex risks than conventional projects and high correlation and conductivity are among the associated risk factors. Previous risk assessment frameworks for rail infrastructure have ignored the effects of risk interactions that inflate risk levels...
journal article 2020
document
Onencan, A.M. (author), Liu, Lian Ena (author), van de Walle, B.A. (author)
The global impacts of disaster risks are on the rise. Moreover, evidence shows that the severity of damage will increase exponentially. In 2019, there were 395 natural disasters that caused 11,755 deaths. Literature and practice indicate that diversification of disaster risk management (DRM) approaches can make communities more resilient. One...
journal article 2020
document
Yu, M. (author), Wood, Paul (author), van de Giesen, N.C. (author), Liu, X. (author), Li, Qiongfang (author), Wang, Guoqing (author), Zhang, Jianyun (author)
River regulation by the construction of reservoirs represents one of the greatest challenges to the natural flow regime and ecological health of riverine systems globally. The Danjiangkou (DJK) Reservoir is the largest reservoir on the Hangjiang River and commenced operations in 1967. The reservoir was upgraded in 2012 to provide water...
journal article 2020
document
Chen, L. (author), Ling, Fangqiong (author), Bakker, Geo (author), Liu, Wen Tso (author), Medema, G.J. (author), van der Meer, W.G.J. (author), Liu, G. (author)
Worldwide, it is common that the drinking water distribution systems (DWDSs) may be subjected to changes of supply water quality due to the needs of upgrading the treatment processes or switching the source water. However, the potential impacts of quality changed supply water on the stabilized ecological niches within DWDSs and the associated...
journal article 2020
document
Liu, Huimin (author), Jiang, Canhui (author), Liu, Y. (author), Hertogh, M.J.C.M. (author), Lyu, Xue (author)
The high uncertainty of megaproject results in increasing complexity in the decisionmaking and ultimately leads to different degrees of cost overrun and project delays. One of the critical reasons for cost overrun and delay is the optimism bias of decision makers. Although the previous literature has analyzed the cost overrun distribution of...
journal article 2018
document
Tong, Ruipeng (author), Zhai, Cunli (author), Jia, Qingli (author), Wu, Chunlin (author), Liu, Y. (author), Xue, Surui (author)
In order to explore optimal strategies for managing potential human risk factors, this paper developed an interactive model among potential human risk factors based on the development processes of accidents. This model was divided into four stages, i.e., risk latency stage, risk accumulation stage, risk explosion stage and risk residue stage....
journal article 2018
document
He, D. (author), Pang, Y. (author), Lodewijks, G. (author), Liu, X. (author)
Belt conveyors play an important role in the dry bulk material handling process. Speed control is a promising method of reducing the power consumption of belt conveyors. However, inappropriate transient operations might cause risks like material spillage away from the belt conveyor. The unexpected risks limit the applicability of speed...
journal article 2018
document
Liu, Feihong (author)
Flooding is one of the most frequent and terrible natural disasters. For the coastal areas connecting inland with the open sea, the occurrence of flooding could be caused by high flows from inland rivers or high-water levels at open sea (e.g., from tsunamis or storm surge). There is also one extreme case that high sea level and high inland flow...
master thesis 2017
document
Liu, Wen (author), Ramirez, Andrea (author)
Geo-resources play an increasing significant role in achieving a sustainable energy future. However, their exploitation is not free of environmental impacts. This paper aims to identify the lessons and knowledge gaps on understanding of the sources, mechanisms and scope of environmental consequences of underground geo-energy resources...
review 2017
document
Liu, S. (author)
This thesis contributed to the literature analyzing the functioning of deregulated wholesale electricity markets. In particular, it focused on the empirical analysis of ex-post forward risk premium in the Spanish electricity market. It aimed to investigate the risk drivers behind the forward risk premium, and therefore to gain insights about...
master thesis 2015
document
Liu, Q. (author)
Priva is a Dutch company in the field of indoor control and automation. Its two main business segments are commercial building control and greenhouse control. In the commercial building segment, Priva’s business currently specializes in Heating, Ventilation and Air Conditioning (HVAC) control, floor control and energy management.However,...
master thesis 2012
Searched for: subject%3A%22risk%22
(1 - 18 of 18)