Searched for: subject%3A%22tunnel%22
(1 - 7 of 7)
document
Dalgiç, K.D. (author), Hendriks, M.A.N. (author), Ilki, Alper (author), Broere, W. (author)
The current article presents a case study of the settlement response of the historic Hoca Pasha Mosque that involves uncertainties arising from the complex excavation activities, soil properties, building materials, and geometry and the presence of pre-existing cracks in the mosque’s walls. The objective is to demonstrate the added value of a...
journal article 2018
document
Kovačević, Meho Saša (author), Gavin, Kenneth (author), Stipanović Oslaković, Irina (author), Librić, Lovorka (author)
The 189.50 m long Bobova tunnel constructed in 2005 is located on the D404 state highway and passes under a part of the Vežica – Sušak town area in Rijeka. The overburden above the tunnel pipe is between 2 m to 18 m thick. The rock mass along the tunnel route is made up of karst deposits (transient carbonate breccia, dolomite and limestone...
conference paper 2018
document
Mooney, M. (author), Grasmick, J. (author), Prantil, E. (author), Thompson, A. (author)
Ground, building and utility deformation monitoring is a well-accepted and required practice for underground construction works in urban environments. The availability of real-time monitoring data during construction allows stakeholders to stay ahead of potential problems, to make decisions prior to damage occurrence, and ultimately to reduce...
conference paper 2015
document
Festa, D. (author)
The thesis investigates the mechanical equilibrium of a Tunnel Boring Machine (TBM) driving in soft soil. The interaction between the TBM-shield and the soil is also investigated. The analysis is based on monitoring data gathered during the construction of the Hubertus tunnel in The Hague, Netherlands. The monitoring activities during tunnel...
doctoral thesis 2015
document
Netzel, H.D. (author)
doctoral thesis 2009
document
Bakker, K.J. (author), Bezuijen, A. (author)
Ten years have passed since in 1997 for the first time construction of bored tunnels in the Netherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-cover tunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd Heinenoord tunnel and the Botlek Rail tunnel....
conference paper 2008
document
Bakker, K.J. (author), De Boer, F. (author), Admiraal, J.B.M. (author), Van Jaarsveld, E.P. (author)
Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be given. The Second Heinenoord Tunnel has...
journal article 1999
Searched for: subject%3A%22tunnel%22
(1 - 7 of 7)