MB
M. Biesheuvel
info
Please Note
This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.
1 records found
1
Contributed
Embedding of subsea pipelines for protection purposes is usually done in a ‘Trench – Install – Backfill’ operation. The pipeline can also be embedded after it is installed on the seabed. This method is called post-trenching. When using a trailer suction hopper dredger for post-tr
...