Power management systems (PMS) of low-carbon technologies (LCTs) such as PV generation, electric vehicles (EVs), and heat pumps (HPs) battery energy storage systems (BESS) are becoming increasingly important for energy arbitrage and ancillary services provision. In this work, a PMS is developed which is based on optimal dispatch to maximize cost savings, perform direct load control (DLC) for congestion management, and offer frequency regulation reserves while simultaneously optimally allocating BESS capacity in a distribution grid. Results showed that a BESS installation is not economically viable only with energy arbitrage but becomes highly profitable when ancillary services such as frequency regulation are provided. Furthermore, it was shown that a centralized BESS at the closest node to the main grid is the most beneficial solution due to lower power losses, although that also depends on the price profiles and the different flexibilities of the nodes. The importance of a BESS installation and the benefits of its synergy with flexible loads for both system-wide frequency regulation, as well as for direct load control for congestion management, were also proven, increasing DLC and load shifting success rates to always above 90%. In this regard, commercial nodes that are characterized by low flexibility are in the greatest need of a BESS installation if they participate in ancillary services provision.
The first level involves day-ahead scheduling of flexible loads (EVs, HPs) and ESS allocation. This stage utilises mixed-integer programming (MIP) to achieve optimal ESS sizing and siting based on day-ahead electricity prices, predicted data on EV arrivals and departures, and building occupancy. Additionally, the aFRR prices are known a day ahead, and the most lucrative time intervals for revenue maximisation are selected. The objective function minimises the total cost, which consists of penalties related to customer satisfaction, grid import/export cost, revenues from aFRR provision, and BESS CAPEX and O\&M cost. Two different MIP formulations were used to solve the optimisation in Gurobi using Python programming language.
The second level involves real-time control, where ESS operation is re-optimized using real-time data. This stage adjusts for forecast errors through rolling horizon optimisation. Within this level, the scheduled aFRR reserves are deployed.
The findings reveal that the optimal integration of ESS, considering additional revenue from aFRR provision, is achieved by using a centralised ESS closer to the substation. In contrast, optimal ESS integration for energy arbitrage alone involves sharing capacity between nodes but requires a lower CAPEX cost of BESS to be economical. The results indicate that optimal BESS allocation can differ based on specific conditions, such as imbalance price distribution, grid limits, peak load and EV flexibility. To maximise revenue and efficiency, the study suggests placing the BESS at nodes with the lowest resistance. Winter and summer results are similar in the optimal placement and sizing of BESS, although the operation of BESS and EVs is different. It was observed that during the winter, V2G utilisation was higher. The main difference for the seasons is in the case of only energy arbitrage. The cost savings from ancillary service provision of either BESS, EVs or both show greater potential for summer. Both of the proposed optimisations can find a solution, although the non-convex MIQCP formulation did not guarantee a global optimum for all cases. However, the iterative method proved to be more robust but had a longer simulation time. ...
The first level involves day-ahead scheduling of flexible loads (EVs, HPs) and ESS allocation. This stage utilises mixed-integer programming (MIP) to achieve optimal ESS sizing and siting based on day-ahead electricity prices, predicted data on EV arrivals and departures, and building occupancy. Additionally, the aFRR prices are known a day ahead, and the most lucrative time intervals for revenue maximisation are selected. The objective function minimises the total cost, which consists of penalties related to customer satisfaction, grid import/export cost, revenues from aFRR provision, and BESS CAPEX and O\&M cost. Two different MIP formulations were used to solve the optimisation in Gurobi using Python programming language.
The second level involves real-time control, where ESS operation is re-optimized using real-time data. This stage adjusts for forecast errors through rolling horizon optimisation. Within this level, the scheduled aFRR reserves are deployed.
The findings reveal that the optimal integration of ESS, considering additional revenue from aFRR provision, is achieved by using a centralised ESS closer to the substation. In contrast, optimal ESS integration for energy arbitrage alone involves sharing capacity between nodes but requires a lower CAPEX cost of BESS to be economical. The results indicate that optimal BESS allocation can differ based on specific conditions, such as imbalance price distribution, grid limits, peak load and EV flexibility. To maximise revenue and efficiency, the study suggests placing the BESS at nodes with the lowest resistance. Winter and summer results are similar in the optimal placement and sizing of BESS, although the operation of BESS and EVs is different. It was observed that during the winter, V2G utilisation was higher. The main difference for the seasons is in the case of only energy arbitrage. The cost savings from ancillary service provision of either BESS, EVs or both show greater potential for summer. Both of the proposed optimisations can find a solution, although the non-convex MIQCP formulation did not guarantee a global optimum for all cases. However, the iterative method proved to be more robust but had a longer simulation time.