CM

C. Mendes Borges

1 records found

Analysis of friction development at microtunneling case study

Microtunneling under the river IJ, Amsterdam

In 2005, a pipeline construction was undertaken under the river IJ in Amsterdam. The microtunneling method was used and it consisted of a closed front TBM of 1800mm diameter over a length of 785m in Pleistocene Sand and extremely soft Holocene sediments and anthropogenic sediment ...