SV

Sander Van Aken

Authored

4 records found

During infrastructure maintenance possessions, commonly not all trains can operate, and the original timetable may have to be adjusted accordingly. To deliver the best service to passengers, operators have to coordinate adjustment measures dealing with multiple possessions at the ...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure maintenance. Up until now, not much research has been devoted to adjusting the timetable due to long maintenance or constructions' possessions. In this article, we introduce the Train ...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure maintenance. This also means adjusting the timetable due to long maintenance or constructions’ possessions. In this article, we introduce the Train Timetable Adjustment Problem (TTAP), ...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure maintenance. This also means adjusting the timetable due to long maintenance or constructions’ possessions. In this article, we introduce the Train Timetable Adjustment Problem (TTAP), ...