PP

P Pellegrini

15 records found

To further improve the capacity on the European railway network, next-generation distance-to-go signalling systems are being developed in the context of the European Train Control System (ETCS). This paper investigates the impact of track discretisation granularity on conflict de ...

Deliverable D4.2

Guidelines for a Safe and Optimised Moving-Block Traffic Management System Architecture

This deliverable contains the output of the activities performed for Task 4.3 “Guidelines on integrated traffic management architectures for safe and optimised moving-block operations” of the EC Shift2Rail PERFORMINGRAIL project. A real-time model for Moving Block traffic conflic ...