6 records found

A next step in disruption management

Combining operations research and complexity science

Railway systems occasionally get into a state of being out-of-control, meaning that barely any train is running, even though the required resources (infrastructure, rolling stock and crew) are available. Because of the large number of affected resources and the absence of detaile ...
Train passenger demand fluctuates throughout the day and week and these fluctuations are expected to increase due to the COVID-19 pandemic. In order to let train services, such as the line plan and timetable, match this fluctuating demand, insights are needed into how the demand ...
Train passenger demand fluctuates throughout the day and week and these fluctuations are expected to increase due to the COVID-19 pandemic. In order to let train services, such as the line plan and timetable, match this fluctuating demand, insights are needed into how the demand ...
Railway systems occasionally get into a state of out-of-control, meaning that there is barely any train is running, even though the required resources (infrastructure, rolling stock and crew) are available. These situations can either be caused by large disruptions or unexpected ...
Train passenger demand fluctuates throughout the day. In order to let train services, such as the line plan and timetable, match this fluctuating demand, insights are needed into how the demand is changing and for which periods the demand is relatively stable. Hierarchical cluste ...
Winter weather has a major impact on railway operations in the Netherlands. To stay in control, the number of trains is reduced by 20% in a special “winter timetable”. This results in a more controllable network, but an insufficient amount of transport capacity. Adapting the line ...

Contributed

1 records found

The construction of cyclic railway timetables is an important task for Netherlands Railways (NS).This construction can be formulated as a Periodic Event Scheduling Problem (PESP). The most powerful technique for solving cyclic railway timetabling problems is constraint programmin ...