AM
A. Metrikine
info
Please Note
This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.
1 records found
1
Contributed
The Smit sawing wire system was used in the salvage operation of the Baltic Ace. The sawing wire was drilled underneath the wreck and connected to two barges on opposite sides. Winches were placed on the barges to make a controlled cut through the wreck by pulling the sawing wire
...