Circular Image

L.R. Planken

4 records found

CP for Scheduling under Uncertainty

A Comparative Study of STNUs against Proactive and Reactive Approaches

This report investigates the effectiveness of Simple Temporal Networks with Uncer- tainty (STNUs) for solving the Stochastic Flexible Job-Shop Scheduling Problem with Sequence-Dependent Setup Times (SFJSP-SDST), comparing it against proactive and reactive Constraint Programming ( ...

Comparing Dynamic Scheduling Algorithms for Multi-Mode RCPSP/max under Uncertainty

A Comparative Analysis on the Proactive, Reactive, and STNU algorithms with Generalised Time-Lags and No-Wait Constraints

This study investigates the performance of three dynamic scheduling approaches—proactive, reactive, and STNU-based—for solving the Multi-Mode Resource-Constrained Project Scheduling Problem with maximal time-lags and no-wait constraints (MMRCPSP/max) in uncertain environments. T ...

Algorithms for dynamic scheduling in manufacturing, towards digital factories

Flexible Job Shop Scheduling Problems (FJSPs) with generalized time-lags and no-wait constraints

This study investigates scheduling strategies for the stochastic duration flexible job-shop problem with no-wait and general time lags constraints (FJSP/NW-GTL). Progress in Constraint Programming (CP) and temporal-networks has renewed interest in assessing the strengths and limi ...
Modern manufacturing systems must meet hard delivery deadlines while coping with stochastic task durations caused by process noise, equipment variability, and human intervention. Traditional deterministic schedules break down when reality deviates from nominal plans, triggering c ...