Aggregated models of offshore wind farm components for grid study
Y Zhou (TU Delft - Electrical Power Processing)
Pavol Bauera (TU Delft - Electrical Power Processing)
JA Ferreira (TU Delft - Electrical Power Processing)
J Pierik (External organisation)
More Info
expand_more
Abstract
The large offshore wind farms are planed to be connected with power grid at transmission level due to their large power capacity and possible long transmission distances. HVDC thyristor bridge as well as other integration methods requires systematical integration studies. In this paper, thyristor bridge models developed in Matlab/Simulink are fast and accurate enough for electromechanical and electromagnetic simulations.
No files available
Metadata only record. There are no files for this record.