Circular Economy in the building sector

Three cases and a collaboration tool

Journal Article (2018)
Author(s)

E.J. Leising (TU Delft - Energy and Industry, Rebel Group)

Jaco Quist (TU Delft - Energy and Industry)

NMP Bocken (Lund University, TU Delft - Responsible Marketing and Consumer Behavior)

Research Group
Energy and Industry
Copyright
© 2018 E.J. Leising, J.N. Quist, N.M.P. Bocken
DOI related publication
https://doi.org/10.1016/j.jclepro.2017.12.010
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 E.J. Leising, J.N. Quist, N.M.P. Bocken
Research Group
Energy and Industry
Volume number
176
Pages (from-to)
976-989
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The Circular Economy (CE) gained significant traction in business and academia. While in the building sector issues around energy efficiency are being widely explored, CE is still a relatively new topic. This article reports on three CE pilots in the Dutch building sector and develops a collaboration tool for developing and operating circular buildings and their supply chain collaborations. First, a conceptual framework is developed to study supply chain collaboration in circular buildings, which uses theoretical building blocks for visions, actor learning, network dynamics and business model innovation. Second, a case study is presented where the framework is applied to three cases using semi-structured interviews and document analysis. Third, an empirically-based tool is developed to enhance collaboration for CE in the building sector. The cases include a newly built project, a renovation project and a demolition project. It was found that developing circular buildings requires (i) a new process design where a variety of disciplines in the supply chain is integrated upfront, (ii) the co-creation of an ambitious vision, (iii) extension of responsibilities to actors along the entire building supply chain, and (iv) new business and ownership models.

Files

JCLP_uncorrected_proof_Leising... (pdf)
(pdf | 1.02 Mb)
- Embargo expired in 05-12-2019
License info not available