Optimizing the preparation phase to a tender phase that is conducive for sustainable product innovations

An exploratory study to identify influential (external) factors

Master Thesis (2020)
Author(s)

F. Gökhan (TU Delft - Mechanical Engineering)

Contributor(s)

S.A. Miedema – Mentor (TU Delft - Offshore and Dredging Engineering)

Kas Hemmes – Graduation committee member (TU Delft - Economics of Technology and Innovation)

A. Straub – Graduation committee member (TU Delft - Public Commissioning)

Faculty
Mechanical Engineering
Copyright
© 2020 Funda Gökhan
More Info
expand_more
Publication Year
2020
Language
English
Copyright
© 2020 Funda Gökhan
Graduation Date
15-10-2020
Awarding Institution
Delft University of Technology
Programme
Offshore and Dredging Engineering
Sponsors
Antea Group
Faculty
Mechanical Engineering
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Contractors can be stimulated to offer sustainable product innovations through tenders in the GWW sector. But despite the sustainability ambitions of clients to achieve a 100% circular economy by 2050 and sustainably generated energy in the Netherlands, contractors are hindered from being able to offer sustainable product innovations by clients. To make recommendations to clients to optimize the preparation phase of public procurement. In order to contribute to this, it is made clear how contractors can be stimulated by investigating the influential (external) factors of the tender phase that can stimulate contractors to offer sustainable product innovations with a TRL level 7-9 during the tender phase.