Flow patterns around longitudinal training dams

Conference Paper (2017)
Author(s)

B.W. van Linge (HKV Lijn in Water)

E Mosselman (Deltares, TU Delft - Rivers, Ports, Waterways and Dredging Engineering)

S. Vuren (Deltares, TU Delft - Hydraulic Structures and Flood Risk)

G.W.F. Rongen (HKV Lijn in Water)

Wim Uijttewaal (TU Delft - Environmental Fluid Mechanics)

Research Group
Rivers, Ports, Waterways and Dredging Engineering
Copyright
© 2017 B.W. van Linge, E. Mosselman, S. van Vuren, G.W.F. Rongen, W.S.J. Uijttewaal
More Info
expand_more
Publication Year
2017
Language
English
Copyright
© 2017 B.W. van Linge, E. Mosselman, S. van Vuren, G.W.F. Rongen, W.S.J. Uijttewaal
Research Group
Rivers, Ports, Waterways and Dredging Engineering
Volume number
NCR publication 41-2017
Pages (from-to)
42-43
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

With the
intention to reduce the negative  effects
of ongoing bed erosion, as well as to  improve
several other river functions such as  protection
against floods, provision of safe and  efficient
navigation and ecology, a ‘pilot project 
longitudinal training dams’ was initiated. The  training dams have recently been implemented  in the Waal between Tiel and Sind Andries. In  this project, river groynes have been  completely removed and replaced by dams  that lie parallel to the river bank. With
help of  the longitudinal training dams,
a two-channel  river system is created in
which the river is  divided into a main
and side channel. The  dams are placed in
a continuous manner with  openings in
between that are relatively small  compared
to the dam length. At the beginning  and
end of the dam an inlet and outlet region is 
situated, as shown in Fig. 1.  The
combination of inlet and openings  allows
for water and sediment to be divided  between
the main and the side channel. Both  inlet
and openings are constructed with the  help
of a porous rock-layer. The crest heights 
can be altered by adding or removing stones.  This is expected to influence the amount of  water and sediment entering the side channel  and can therefore be used as a regulation
tool. 



Files

License info not available