Economic outage scheduling of transmission line for long-term horizon under demand and wind scenarios

Conference Paper (2018)
Author(s)

Raunak R. Kulkarni (Student TU Delft)

Swasti Khuntia (TU Delft - Intelligent Electrical Power Grids)

A. Joseph (TU Delft - Intelligent Electrical Power Grids)

Jose Luis Rueda Torres (TU Delft - Intelligent Electrical Power Grids)

Peter Palensky (TU Delft - Intelligent Electrical Power Grids)

Research Group
Intelligent Electrical Power Grids
Copyright
© 2018 Raunak R. Kulkarni, S.R. Khuntia, A. Joseph, José L. Rueda, P. Palensky
DOI related publication
https://doi.org/10.1109/ISGTEurope.2018.8571701
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 Raunak R. Kulkarni, S.R. Khuntia, A. Joseph, José L. Rueda, P. Palensky
Research Group
Intelligent Electrical Power Grids
Bibliographical Note
Green Open Access added to TU Delft Institutional Repository ‘You share, we take care!’ – Taverne project https://www.openaccess.nl/en/you-share-we-take-care Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public. @en
Pages (from-to)
1-6
ISBN (electronic)
978-1-5386-4505-5
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

A substantial increase in renewable energy in-feed to the primary grid as well as demand growth poses a challenge for transmission system operators (TSOs) to perform maintenance activities while addressing security of supply. A computationally efficient outage scheduling algorithm which is customizable in terms of area and time selection is proposed in this paper. Benders decomposition approach under different demand and wind scenarios, spanning two-stage stochastic programming approach is used. An accurate schedule while fulfilling both maintenance and network constraints is validated on a modified IEEE RTS-24 bus system in GAMS environment. A cost comparison analysis is also performed in this study.