Assessment of the impact of tidal power extraction from the Eastern Scheldt storm surge barrier through the evaluation of a pilot plant
Anton De Fockert (Deltares)
Arnout C. Bijlsma (Deltares)
Tom O'Mahoney (Deltares)
Wilbert Verbruggen (Deltares)
Peter C. Scheijgrond (Bluespring)
Z.B. Wang (TU Delft - Coastal Engineering)
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
Hydraulic structures can be a promising place for tidal energy extraction due to the high flow velocities, easy access to the power grid and easy access for maintenance. However, quantification of the impacts of a tidal power plant in a hydraulic structure is not straight forward. In 2015 a pilot plant consisting of an array of five Tocardo tidal turbines was installed in the Eastern Scheldt Storm Surge Barrier in the Netherlands. This pilot was accompanied by monitoring studies to verify that the operation of the plant had no adverse impact on the barrier and its surroundings. This paper presents the assessment of the hydraulic impact of the tidal power plant in the storm surge barrier based on an analysis of water level and current measurements, combined with numerical modeling and followed by an assessment of the environmental impact with emphasis on the effects on the intertidal areas in the estuary. This validation approach by a pilot plant is imperative to understand the interaction between tidal turbines and the hydraulic structure on the local scale. This understanding gives extra credibility to the predictions of the extrapolated large-scale and large array assessments which will always be fully numerical.