Balancing Waste Water Treatment Plant Load Using Branch and Bound

More Info
expand_more

Abstract

The problem of smoothing dry weather inflow variations for
a Waste Water Treatment Plant (WWTP) that receives sewage from
multiple mixed sewer systems is presented, together with a first rough
solution algorithm. A simplification followed by a naive translation into
a zero-one linear programming problem results in 1152 inequalities for
480 binary variables.

Files