New Lattice-Tubular Tower for Onshore WEC - Part 1

Structural Optimization

Journal Article (2017)
Author(s)

S. Jovašević (Universidade de Coimbra)

Mohammad Reza Shah Mohammadi (Universidade de Coimbra)

Carlos A.S. Rebelo (Universidade de Coimbra)

Marko Pavlović (TU Delft - Steel & Composite Structures)

Milan Veljkovic (TU Delft - Steel & Composite Structures)

Research Group
Steel & Composite Structures
Copyright
© 2017 Slobodanka Jovašević, Mohammad Reza Shah Mohammadi, Carlos Rebelo, M. Pavlovic, M. Veljkovic
DOI related publication
https://doi.org/10.1016/j.proeng.2017.09.336
More Info
expand_more
Publication Year
2017
Language
English
Copyright
© 2017 Slobodanka Jovašević, Mohammad Reza Shah Mohammadi, Carlos Rebelo, M. Pavlovic, M. Veljkovic
Research Group
Steel & Composite Structures
Volume number
199
Pages (from-to)
3236-3241
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Currently, onshore wind turbines are economical for 2.5 mega-watt inland installation [1]. One of the alternatives to achieve the higher power capacity in onshore wind turbines is to go to higher altitude, which increases the wind speed and has more uniform wind pressure, leading to higher possible annual energy production and relatively lower maintenance costs due to wind shear induced vibrations. This paper deals with a predesign of a new type of tower that should overcome known disadvantages of steel tubular towers for heights over 150 meters. This first part of the paper addresses the viability of a hybrid support structure in respect of ultimate limit states and structural dynamics as part of the requirements in exploring the feasibility of the hybrid tower concept. The hybrid wind turbine tower concept consists of a lattice (lower) structure and a tubular tower for the higher tower segment. The study cases found in literature were designed with maximum height of 160m and the 2.5MW wind turbine. Moreover, they used commercial "L" sections which leads to high number of connections and bolts. The project that supports the present paper aims at using optimally design hollow cross sections, to reduce the number of connections, and low maintenance type bolts. The developed study case is made for 220m tower height and using 5MW wind turbine.