Circular performance of project equipment

The material circularity and economic value of project equipment on a project, product, and company level

Master Thesis (2024)
Author(s)

T.O. Rodermond (TU Delft - Mechanical Engineering)

Contributor(s)

JFJ Pruijn – Mentor (TU Delft - Ship Design, Production and Operations)

Austin Kana – Mentor (TU Delft - Ship Design, Production and Operations)

Faculty
Mechanical Engineering
Copyright
© 2024 Timo Rodermond
More Info
expand_more
Publication Year
2024
Language
English
Copyright
© 2024 Timo Rodermond
Graduation Date
23-01-2024
Awarding Institution
Delft University of Technology
Programme
['Marine Technology | Maritime Operations and Management']
Faculty
Mechanical Engineering
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The global awareness of the environmental and economic advantages of the circular economy (CE) concept has grown significantly. In order to implement this concept into company practices, a vital starting point is the adoption of a measurement framework. In the past years, the evolution of CE metrics resulted in maturity and practical applicability. However, no method exists able to quantify CE performance specific to a project-based organization. The Material Circularity Indicator (MCI) is one of the most ambiguous methods, which captures circularity with mass as the measurement unit. Alternatively, the Material Circularity Indicator based on economic value (MCI’) is developed as a solution for the reliance of the MCI on mass flow, by using cost-based economic value as the measurement unit. However, existing economic value indicators — as accounts for the MCI’ — are criticized for not including all significant and relevant life cycle cost factors. To solve these implications, both methods are adapted to indicate the CE performance on the levels of interest for a project-based organization: the project, product, and company level. To work from level to level, a bottom-up approach is taken, aggregating using a weighted sum. Additionally, the MCI’ is enhanced by including more life cycle cost factors. The results show that the enhanced MCI’ gives a more accurate estimate of cost-based economic value. Furthermore, the aggregation from the project level to the product and company level, gives valuable insights into the CE performance of project-based organizations.

Files

License info not available