Searched for: +
(1 - 2 of 2)
document
Torres Alves, G.A. (author), 't Hart, C.M.P. (author), Morales Napoles, O. (author), Jonkman, Sebastiaan N. (author)
A submerged floating tunnel (SFT) is a structure that has been proposed as an innovative solution for waterway crossings around the world. However, to this day, no SFT has been constructed yet. One of the main reasons is that there is an insufficient insight into the structural reliability of the SFT. Here, a method to assess the expected...
journal article 2022
document
Bruijn, Willem E.L. (author), Rip, Jolien (author), Hendriks, Antoon J.H. (author), van Gelder, P.H.A.J.M. (author), Jonkman, Sebastiaan N. (author)
A marine project consists of series of operations, with each operation subject to a predefined operational limit and duration. If actual weather conditions exceed the operational limit, the operation cannot be executed and hence downtime occurs. An accurate assessment of uncertainties and the expected downtime during a marine project is...
journal article 2019