Searched for: +
(1 - 19 of 19)
document
Shang, Y. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Improvement in rail asset safety, comfortability and serviceability is gaining importance. This requires effective service life management by incorporating multi-stakeholder desires in the early design stage. Typical stakeholders are asset owners, train users and maintenance service providers. To allow for this change, the traditional single...
conference paper 2023
document
van Heukelum, H.J. (author), Steenbrink, A.C. (author), Colomés, Oriol (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Floating wind farms are a promising solution for offshore wind energy production in deep waters. However, the design optimisation process of these farms is difficult due to their complex and multidisciplinary nature. Furthermore, current optimisation methods: 1) ignore and/or provide no insight into the dynamic interplay between the preference...
conference paper 2023
document
Zhilyaev, D. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Within traditional design processes, decisions are often made based on individualistic values and late-stage assessments conducted on a predefined set of design alternatives potentially leading to suboptimal design decisions and conflicts. The issues are further amplified by the growing complexity of construction project management where an...
journal article 2022
document
Wolfert, A.R.M. (author), van Nederveen, G.A. (author), Binnekamp, R. (author)
Building Information Models (BIM) should reflect all aspects and phases of the construction projects life cycle. However, in current contractor practices, a proliferation of different information systems has arisen, each of which in turn illuminates a different information model dimension (nD) for usually only one construction project management...
journal article 2022
document
Kammouh, O. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Construction project management requires dynamic mitigation control to ensure a project's timely completion. Current mitigation approaches are usually performed by an iterative Monte Carlo (MC) analysis which does not reflect (1) the project manager's goal-oriented behavior, (2) contractual project completion performance schemes, and (3)...
journal article 2022
document
Kammouh, O. (author), Kok, M.W.A. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Changes in a construction project schedule can impact the project's planned duration, resulting in penalties. A manual trial-and-error probabilistic approach is usually conducted to find an appropriate set of corrective measures to mitigate delays of the overall project. However, this approach does not capture the actual goal-oriented...
journal article 2022
document
Kammouh, O. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Probabilistic Monte Carlo simulations are often used to determine a project's completion time given a required probability level. During project execution, schedule changes negatively affect the probability of meeting the project's completion time. A manual trial and error approach is then conducted to find a set of mitigation measures to...
journal article 2021
document
Kammouh, O. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
The wellbeing of modern societies is dependent upon the functioning of their infrastructure networks. This paper introduces the 3C concept, an integrative multi-system and multi-stakeholder optimization approach for managing infrastructure interventions (e.g., maintenance, renovation, etc.). The proposed approach takes advantage of the...
journal article 2021
document
Kammouh, O. (author), Nogal Macho, M. (author), de Bruijne, M.L.C. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)
Despite widespread attention for the governance of infrastructures and improvements of the way infrastructure assets are maintained, the interdependency of infrastructures is not often considered from a systemic maintenance and renovation perspective. In this context, the issue of unforeseen intervention delays is of particular relevance because...
conference paper 2020
document
Binnekamp, R. (author), Wolfert, A.R.M. (author), Kammouh, O. (author), Nogal Macho, M. (author)
Construction Management and Engineering students need to acquire managing skills for solving real-world problems that are complex, rarely straightforward and lack 'one right answer'. For this, they need to become 'open designers', capable to be reflective, integrative and creative in- and on action with dynamic and new situations. In this...
conference paper 2020
document
Basdogan, Serhat (author), Remøy, H.T. (author), Binnekamp, R. (author)
With the rapid development of real estate markets under globalization and exponential competitive market conditions, risk evaluation has been one of the most important tasks in the process of real estate investment valuation. This paper describes the relationship between construction permit uncertainties and real estate development projects by...
conference paper 2018
document
De Visser, Hylke (author), Arkesteijn, M.H. (author), Binnekamp, R. (author), de Graaf, R.P. (author)
Purpose–Alignment of corporate real estate to a corporation’s business strategy is a long-standing issue. In the past multiple models have been developed to support this process, but research shows that they fall short on certain parts of the CRE alignment activity, often lack transparency and fail to choose the real estate strategy that...
abstract 2017
document
De Visser, Hylke (author), Arkesteijn, M.H. (author), Binnekamp, R. (author), de Graaf, R.P. (author)
Purpose –Alignment of corporate real estate to a corporation’s business strategy is a long-standing issue. In the past multiple models have been developed to support this process, but research shows that they fall short on certain parts of the CRE alignment activity, often lack transparency and fail to choose the real estate strategy that...
conference paper 2017
document
Greco, A. (author), Konstantinou, T. (author), Schipper, H.R. (author), Binnekamp, R. (author), Gerritsen, Esther (author), van den Dobbelsteen, A.A.J.F. (author)
In Europe, the DIRECTIVE 2010/31/EU requires increasing the number of nearly zero energy buildings. The existing building stock needs to be included in order to achieve the 2020 EU environmental targets. The main barriers of energy neutral refurbishment of existing non-residential buildings appear to be financial rather than technical, next to a...
conference paper 2017
document
Binnekamp, R. (author), Nase, I. (author), Koppels, P.W. (author), Remøy, H.T. (author)
The department of MBE was originally called Real Estate & Project Management (BMVB: ‘Bouwmanagement & Vastgoedbeheer’) covering the domains of construction management and real estate management. The “raison d’être” for this new department was based on the recognition that a fair amount of architecture graduates were more interested in...
book chapter 2016
document
Arkesteijn, M.H. (author), Binnekamp, R. (author), de Jonge, H. (author)
One of the long-standing issues in the field of corporate real estate corporate strategy. Extensive research into existing approaches brought valuable insights into steps, components and variables that are needed in the alignment process. Despite that, it is not clear if existing approaches had much uptake in practice and they fall short in a...
abstract 2016
document
Greco, A. (author), Konstantinou, T. (author), Schipper, H.R. (author), Binnekamp, R. (author), Gerritsen, E. (author), de Graaf, R.P. (author), van den Dobbelsteen, A.A.J.F. (author)
Net zero energy is already an ambitious target for several buildings, especially since the DIRECTIVE 2010/31/EU that requires increasing the number of nearly zero energy buildings. The existing commercial building stock needs to be included in order to achieve the 2020 EU environmental targets. The main barriers of zero energy refurbishment of...
conference paper 2016
document
Arkesteijn, M.H. (author), Binnekamp, R. (author)
In the Netherlands municipalities own a substantial number of buildings within their city which have been acquired to serve societal goals. However, some buildings might no longer serve these goals and could be sold or, conversely, buildings that could serve societal goals can be acquired. More than one decision maker decides which intervention...
conference paper 2012
document
Binnekamp, R. (author)
Architectural design is a complex process as a result of two prominent characteristics of choice making: 1) multiple designs can fit into one intended purpose, which raises the question: how to choose the design that fits best, and 2) a multitude of decision makers have an interest in the design process, which is the problem of group choice...
doctoral thesis 2010
Searched for: +
(1 - 19 of 19)