Searched for: department%3A%22Hydraulic%22
(1 - 4 of 4)
document
Marinov, K. (author), Arrieta, X. (author), Hewageegana, H. (author), De Almeida, E. (author), Da Silva, R. (author)
The Hague Municipality, which is responsible for Scheveningen Harbour, is seeking solutions for two problems it is currently facing: reorganization/expansion of Scheveningen Harbour considering the shortage of marina places and the future demands; and connection of the north and south sides of the harbour, namely, bridging De Pijp. CoMEM TU...
student report 2016
document
Van den Akker, P. (author), Brands, M. (author), Buijs, W. (author), Hamilton, L. (author)
When the new locks of the Panama Canal are finished in 2015 Post Panamax vessels are able to sail through the Panama Canal. This will increase the container traffic intensity through the Caribbean. China Harbour Engineering Company (CHEC) wants to anticipate on this expansion of the Panama Canal by investing in a US$1.5 billion transshipment...
student report 2013
document
Lemmens, D. (author), Smaling, H. (author), De Jong, J. (author), De Kloet, M. (author)
The predictions for the future foretell an increase of the amount of exported grain over the Rio Paraná/Rio de la Plata system of 63% in 2030. Besides this, the new Panama locks will be finished in 2015. Seeing as the current shipping standard is largely determined by the Panama locks, the general expectation is that the vessel dimensions will...
student report 2012
document
De Fockert, A. (author), Graafland, T. (author), Paap, E. (author), Van der Plas, T. (author), Roubos, A. (author)
The container yard of the port of Lirquen will reach its capacity in a few years and the container terminal has no landward expansion possibilities to meet the future demand of container throughput. The bulk terminal has a lack of berths, due to increased throughput and insufficient depth, but does have possibilities for landward expansion....
student report 2005
Searched for: department%3A%22Hydraulic%22
(1 - 4 of 4)