Searched for: subject%3A%22Strategies%22
(1 - 9 of 9)
document
Marchand, M. (author)
The aim of this report is to document the output of the three workshops and the questionnaire. The results of the Flood risk analysis has been reported in another Floodsite report: De Bruijn et al., 2008. For a complete description of the Schelde pilot study reference is made to Chapter 8 of the FLOODsite book on pilot sites (Schanze, in prep.).
report 2009
document
Tagg, A. (author)
This Final Management Report for the FLOODsite Project provides a summary of the resources and expenditure over the whole project. Detailed information on the costs is contained in the cumulative tabulations presented in the Year 5 Periodic report (T35-09-11) and are not repeated here. Details of the individual Partner Institution resources are...
report 2009
document
Tagg, A. (author)
This Final Management Report for the FLOODsite Project provides a summary of the resources and expenditure over the whole project. Detailed information on the costs is contained in the cumulative tabulations presented in the Year 5 Periodic report (T35-09-11) and are not repeated here. Details of the individual Partner Institution resources are...
report 2009
document
Schanze, J. (author)
The report aims at describing the results of testing a methodology for composing, analysing and evaluating long-term futures of flood risk systems mainly considering scenarios of autonomous change as well as strategic alternatives for targeted flood risk reduction.
report 2009
document
McGahey, C. (author)
This report is Deliverable 18-2 which describes the conceptual, methodological and technological frameworks and how these are implemented for three pilot sites - the Thames, Schelde and Elbe - through prototype decision or ‘discussion’ support tools. The report describes the generic interactions between all relevant factors that drive and...
report 2009
document
Ramsbottom, D. (author)
The purpose of this report is to identify messages from the FLOODsite pilot studies that might be helpful to Policy makers who are responsible for the implementation of the EC Floods Directive. The main requirement identified in this review is the need to develop guidance for methods to implement the Floods Directive based on the results of the...
report 2009
document
Hutter, G. (author)
The report “Strategies for Pre-Flood Risk Management – Case Studies and Recommendations” proposes (1) a theoretical framework to analyse the content, process, and context of strategies for reducing flood risk within catchments. (2) Three case studies illustrate why researchers and practitioners alike can benefit from using the framework to...
report 2007
document
Lindeboom, H. (author), Geurts van Kessel, A.J.M. (author), Berkenbosch, L. (author)
THERE IS BOTH A DUTCH AND AN ENGLISH VERSION OF THIS REPORT AVAILABLE. SEE RIKZ2005008ENGLISH.PDF FOR THE ENGLISH VERSION. Samenvatting In de Nota Ruimte is aangegeven dat een nadere begrenzing van de gebieden met bijzondere ecologische waarden zal plaatsvinden in het Integraal Beheerplan Noordzee 2015 (IBN 2015). Dit rapport geeft daartoe...
report 2005
document
Anonymous, A. (author)
The Danube is an essential Inland Water Transport (IWT) corridor, particularly for the hinterland connection for the Port of Constantza. This port became one of the largest and busiest ports on the Black Sea, due to its strategic location at the cross roads of Europe and Asia and due to its capacity to handle large volumes of different types of...
report 1995
Searched for: subject%3A%22Strategies%22
(1 - 9 of 9)