van Heusden, Joep (author)
Due to the growing demand for offshore wind energy and the increasing wind turbine sizes, a shortage of capable installation vessels is anticipated by 2024. Consequently, the utilisation of heavy-lift vessels, previously not employed for bottom-founded or floating offshore wind turbine installations, may become imperative to realise the offshore...
master thesis 2023
document
Holland, Gijs (author)
This thesis focuses on the going-on-location (GoL) operation of jack-up vessels in the offshore wind energy industry. The GoL process involves the transition of a jack-up vessel from a free-floating state to a state where it’s elevated above the waterline and pinned to the seabed. The workability of these vessels is significantly affected by the...
master thesis 2023
document
van der Kaaij, Isabelle (author)
Offshore wind energy is poised for significant growth, with three major trends emerging: larger wind turbines, offshore wind farm sites in deeper waters further from the coast, and a shift towards floating offshore wind energy. While current floating wind turbines are installed using a tow-to-site strategy, the increasing size of turbines and...
master thesis 2023
document
Tjaberings, Jorick (author)
Adapting the size of upending cradles according to the ever-increasing dimensions of offshore wind turbine monopiles is costly and requires structural modifications to the associated Heavy Lift Vessels (HLVs). This study therefore investigates the potential of the Monopile Upending Smart Tool (MUST), which is a platform suspended in the HLV...
master thesis 2022
document
Mangla, Deepanshu (author)
Currently, Ordinary Portland cement (OPC) concrete accounts for the world's 8-10% anthropogenic carbon/ greenhouse (GHG) emissions, where 90-95% of the emissions are due to the production of OPC. A 200% increase in OPC demand is projected by 2050 from 2010 levels. Therefore, it is urgent to reduce these emissions arising from its production....
master thesis 2021
document
Verbruggen, Jaap (author)
Using a floating vessel operating on its DP-system and using a motion-compensated pile gripper to install monopiles could be the installation method of the future. Therefore, this thesis focuses on this method. The main objective of this thesis project is to build a model that accurately describes the motions of the Stella Synergy, the monopile,...
master thesis 2021
document
Diepenmaat, Frank (author)
Offshore contractors use special cable laying vessels (CLV’s) in order to install subsea power cables, which transport offshore generated energy. Workability studies are performed to evaluate whether operations can be performed or not. These workability studies are subsequently a combination between operability assessments (performed in OrcaFlex...
master thesis 2021
document
Immink, Leon (author)
Within this thesis an attempt is made to improve the seakeeping of a Service Operation Vessel (SOV) by means of an active anti-roll tank (ART). It is researched if the addition of a wave prediction system can improve the ART’s performance. As the seakeeping of the SOV is most important for the installed motion compensated gangway, the...
master thesis 2021
document
van Duijn, Niels (author)
A QUAD lift is a new lifting method in which dual crane vessels combine their vessel capability to increase their offshore lift performance. The use of the Jumbo J-Class vessels in a QUAD lift creates the opportunity to increase the offshore lift capacity and to install structures with larger dimensions. When floating vessels are close to each...
master thesis 2020
document
van den Berg, Maarten (author)
In current offshore wind turbine (WTG) tower installations, bolted flange connections are common. These connections are however reaching their limit due to the maximized size of the bolts. Also, bolted connections require the motions between the tower and foundation to be limited during installation, suggesting their workability of installation...
master thesis 2020
document
van Melis, Tijmen (author)
Wave overtopping is an important aspect for the design of rubble mound breakwaters. Acceptable overtopping limits are usually based on the mean overtopping discharge or the maximum overtopping volume (EurOtop, 2018). For temporary situations, such as breakwaters under construction, overtopping limits are not clearly defined. This complicates the...
master thesis 2019
document
van der Veen, Gerard (author)
To respond to the growing offshore industry Jumbo Maritime has designed a new vessel to expand its offshore fleet: The Stella Synergy. The vessel will be able to install monopiles for the offshore wind and oil and gas industry. The main objective of this thesis is: Making a model that is able to predict the motions of the vessel as well as the...
master thesis 2019
document
van Beurden, Mike (author)
The diversity of offshore structures is increasing nowadays, as more and more offshore structures are floating. To study the opportunity for Ampelmann to expand to the floating market it is necessary to see if working with floating structures requires a new way of operating. A potential market for Ampelmann is transferring maintenance personnel...
master thesis 2019
document
Clarenburg, Jimmy (author)
Designing a controlled offshore system is a challenging process, the system dynamics are often nonlinear and subjected to loads that are random in nature. Furthermore, the proper description of the system’s dynamical behaviour involves knowledge pertaining to several fields. Unfortunately, at the design level, the process is often segregated...
master thesis 2019
document
Clades, Dinos (author)
This master thesis describes a method to determine the workability of an offshore heavy lift operation. By creating wave realisations based on and statistically equivalent to measured ocean weather data, a quick assessment of the risk of failure can be achieved.
master thesis 2018
document
Schouten, Ewout (author)
In this thesis the differences between the monohull and semi-submersible are investigated. For a general heavy lift crane operation and its operational profile, the difference is performance and total cost are calculated. These are used to determine the turning point, the point where the semi-submersible is more favourable for a heavy lift crane...
master thesis 2018
document
Scheltes, Martijn (author)
In the 25 years of existence, the offshore wind market has developed on many aspects. Among others, the dimension of the turbines increased by a factor 15 and the distance to shore increased by a factor of 50. The developments of the offshore wind farms increase the requirements for the installation vessels and as a consequence the present day...
master thesis 2018
document
van Beek, Merel (author)
Since the oil price collapse at the end of 2014, operators in the offshore industry experience a decline in revenues and a need for downsizing. Simultaneously, the wind industry is growing every year, as an increasing amount of companies and consumers are investing in green energy. This creates opportunities for Heerema Marine Contractors (HMC),...
master thesis 2018
document
Metz, Bob (author)
<br/>Vessel motion limits to guarantee operable pipe integrity<br/>Subsea pipelines are extensively used to transport oil and gas from offshore facilities to offshore terminals, pump stations or to the coast. As the installation of pipelines makes up a significant percentage of the total costs of a project, the workability of the installation...
master thesis 2018
document
Buijs, Roderick (author)
When working offshore on a floating vessel, the vessel will be subjected to wave induced motions and with a moving crane tip, a suspended load can start to swing. When the motions of the load become too large, the operation is interrupted. Alternatives such as jack-ups, function as a fixed platform to which the crane is attached, therefore...
master thesis 2017
Searched for: subject%3A%22Workability%22
(1 - 20 of 36)

Pages