ES
E.A. Schouten
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
2 records found
1
In this thesis the differences between the monohull and semi-submersible are investigated. For a general heavy lift crane operation and its operational profile, the difference is performance and total cost are calculated. These are used to determine the turning point, the point where the semi-submersible is more favourable for a heavy lift crane operation. The monohull has relatively low capital and operational costs, but also a lower workability. There is thus a balance that has to be investigated and compared between the two vessel types. This is done for the North Sea and West Africa, which have significantly different sea conditions.
...
In this thesis the differences between the monohull and semi-submersible are investigated. For a general heavy lift crane operation and its operational profile, the difference is performance and total cost are calculated. These are used to determine the turning point, the point where the semi-submersible is more favourable for a heavy lift crane operation. The monohull has relatively low capital and operational costs, but also a lower workability. There is thus a balance that has to be investigated and compared between the two vessel types. This is done for the North Sea and West Africa, which have significantly different sea conditions.
Bachelor thesis
(2015)
-
M.S.T. van den Aarssen, L.M.A. Declerck, M. Dirkzwager, R.J. Everaert, M.W. Goedhart, A.A.E. Naorniakowski, J.M.F. van Neerven, E.A. Schouten, K. Schreiber, K.F. Yip, M.D. Pavel, J. Carvajal Godínez, T. Visser