Monohull versus Semi-submersible for offshore heavy lift crane operations
E.A. Schouten (TU Delft - Mechanical Engineering)
R.G. Hekkenberg – Mentor
Sander Bot – Mentor
I Akkerman – Graduation committee member
Arthur Vrijdag – Graduation committee member
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
In this thesis the differences between the monohull and semi-submersible are investigated. For a general heavy lift crane operation and its operational profile, the difference is performance and total cost are calculated. These are used to determine the turning point, the point where the semi-submersible is more favourable for a heavy lift crane operation. The monohull has relatively low capital and operational costs, but also a lower workability. There is thus a balance that has to be investigated and compared between the two vessel types. This is done for the North Sea and West Africa, which have significantly different sea conditions.