A Case Study of the Twin Dike Eemshaven-Delfzijl Project

Master thesis (2019) - Chris Wauben, Matthijs Kok, Jan Tigchelaar, Kees de Jong, Chris Lashley, Richard Marijnissen, Jeroen van den Bos
The Twin Dike project is an innovative concept to achieve the required flood safety while being able to preserve valuable areas. A lower, second dike is constructed behind the original existing dike. The original dike is only being strengthened to a minimal extent. The general idea behind this project is to more efficiently use the area near the dike without losing valuable nature or buildings during dike reinforcements. At the same time, this concept is expected to be cheaper, provides the required flood safety and the area between the dikes is used for experimental purposes. Currently, there are no pre-defined methods which can be used to easily assess the safety requirements of multiple lines of dikes. This research investigates if multiple lines can be an attractive alternative for traditional dike reinforcements regarding flood safety and costs, to provide the required protection against floods.

In order to answer the research question, it is analysed how flood defences are currently assessed in the Netherlands. Governing loads and failure mechanisms for the Twin Dike are determined. Using current and experimental methods the loads acting on both dikes are determined. Next, a sensitivity analysis is performed to analyse the sensitivity of various aspects on the results. Finally, a cost-benefit analysis is performed.

This research concludes that erosion of the outer slope and overtopping are governing failure mechanisms for the outer dike of the Twin Dike project. Overtopping volumes are, however, not large enough to cause considerable damage to both the outer and inner dike. Existing assessment methods are not good enough to determine the safety of the Twin Dike project with respect to erosion of the outer slope. A prototype model is used to better analyse the effects of erosion of the outer dike and the consequent loads on the inner dike. The model showed that breaches are formed in the outer dike at conditions which have a higher probability of occurrence than allowed by the safety norms. When a breach occurs the inner dike is not able to withstand the consequential loads. A total system failure immediately occurs.

A sensitivity analysis was performed on the overtopping volumes and erosion model results. Sea level rise was the dominant uncertainty for the overtopping volumes. If sea levels will rise extremely within the design lifetime, overtopping volumes can be three times as large compared to the case with mean sea level rise. However, the overtopping volumes are still low enough such that Twin Dike satisfies the required safety norms. For the erosion model, the average return period for which a breach occurs varies greatly with the uncertainty of various parameters. However, using a case with mean values for all variables, the probability of a breach is still larger than allowed by the safety norms.

Also, a cost-benefit analysis was performed to assess if the Twin Dike project is an attractive solution with regards to costs. In this case, from a cost perspective, multiple lines of dikes are not an optimal solution. ...
Student report (2018) - Ascha Simons, Chris Wauben, Lars Pije, Niels van Leeuwen, Robert Jan Labeur, Baukje Kothuis, Jill Slinger, K. Appeaning Addo, E. Mahu, Roland Abspoel, T. Boogaard
Two polluted Ghanaian lagoons are investigated and possible engineering solutions are suggested and researched.
The first lagoon is the Sakumo lagoon, located between Accra and Tema. This lagoon is connected to the sea through a small culvert, which enables a limited amount of water exchange. Since a few years, fishermen have been unable to catch fish in this lagoon, because of invasive plants restraining them from entering the basin. The siltation rate is high due to increasing friction because of these plants and limited sediment outflow through the small culvert. Furthermore, the water quality in the lagoon is poor. An overland flow model and a mixing model are used to evaluate the effects of a change in layout of the lagoon mouth. From this, it follows that a larger connection to the sea is beneficial to the water quality while still maintaining flood safety. However, decisions on the redesign of this lagoon mouth should be made with close regard to stakeholder interests.
The second lagoon is the Klottey lagoon, located in the city centre of Accra. The surroundings of this lagoon are planned to become an area of tourism. Neighbouring the lagoon, a new fishing harbour is planned. The water quality in this lagoon is poor and its water flows along the shore of Accra. The water quality in and near the lagoon is investigated with the development plans of the area in mind. Furthermore, the shoreline response as a result of these interventions is assessed.
...