AA

Adolfo Anta

5 records found

Transmission system operators face significant hurdles in integrating variable renewables and facilitating operational flexibility. This has sparked renewed interest in optimizing network capacity utilization. This paper explores the synergy between two flexibility-enhancing meth ...
The lack of measurements in distribution grids poses a severe challenge for their monitoring: Since there may not be enough sensors to achieve numerical observability, so load forecasts (pseudo-measurements) are typically used, and thus an accurate state estimation is not guarant ...
The small amount of measurements in distribution grids makes their monitoring difficult. Topological observability may not be possible, and thus, pseudo-measurements are needed to perform state estimation, which is required to control elements such as distributed generation or tr ...
In this paper we consider the problem of State Estimation (SE) in large-scale, 3-phase coupled, unbalanced distribution systems. More specifically, we address the problem of including mixed real-time measurements, synchronized and unsynchronized, from phasor measurement units and ...
The increasing amount of controllable generation and consumption in distribution grids poses a severe challenge in keeping voltage values within admissible ranges. Existing approaches have considered different optimal power flow formulations to regulate distributed generation and ...