CK

C. Keijdener

11 records found

At Damen’s Research and Development department, continuous improvements are made to existing design practices using recent technological developments and fatigue design is currently on the anvil. High speed craft operating around the globe are subject to millions of load cycles ( ...

Simulating Bending Failure of Ice using Smoothed Particle Hydrodynamics

A re-usable framework for simulating of fluid problems using SPH

The offshore industry is a conservative industry, sticking to rigid best-practices and reluctant to try new techniques. A promising new technique that hasn't found much adoption in offshore industry is SPH. This thesis aims to improve the reach and use of SPH within the offshore ...
Nowadays, fears over rising sea levels due to global warming have prompted many countries with lands below sea level to find solutions to ensure the safety of nation and citizen. Furthermore, the development and utilization of marine resources have always been a topic of interest ...
Offshore oil and gas projects usually require the presence of more than one facilities in the same location. These facilities need to be connected with each other in order to enable the transfer of personnel among each other. As a result, bridges are implemented for such purposes ...

Fiber optimization of a carbon windsurfing boom

FEM fiber optimization for mass and stiffness

The goal of this research is to optimize the fiber layup of a carbon windsurfing boom for weight and stiffness. A windsurfing boom should be stiff to provide an efficient basis for the energy transfer from the sail through the surfer to the board. The weight of the boom is import ...

Floating blade installation

Analysing the dynamic interaction between tower and installation tool

The demand for blade installation and maintenance is increasing with each additional installed offshore wind turbine. In 2017, 560 additional turbines were installed in Europe, reaching 4149 turbines in total. Currently, they are serviced with cost and time inefficient methods, s ...

The evaluation and improvement of the hydrodynamic behaviour of mechanically coupled barges

A novel decommissioning method for oil and gas platforms in the North Sea

Allseas' Pioneering Spirit is the largest heavy lift vessel in the world. It uses its u-shaped bow to sail around an offshore platform and lift topsides up to 48.000t in a single lift. Despite being the largest vessel in the world, platforms exist that are simply too heavy, or ...
Subsea pipelines that are used for the transportation of oil or gas are installed by pipe-laying vessels. When a pipeline is laid to the seabed, both ends of the pipeline are sealed with an end-piece. This end-piece fulfills an important role when the pipeline is being commission ...
Allseas Group S.A. is a leading offshore contractor in the field of pipeline installation, heavy lifting and subsea construction. One of Allseas’ vessels is Pioneering Spirit. The main activities of Pioneering Spirit can be subdivided into pipeline installation, topside installat ...
With the conversion of a heavy transport vessel into a crane vessel, Boskalis aims to strengthen its position in the offshore wind and decommissioning markets. The BOKALIFT 1, as the crane vessel will be named, is equipped with a 3,000 tonne crane and a class-2 Dynamic Positionin ...
In the last couple of decades, Arctic Engineering has become a topic of interest. There are still plenty rooms of research to understand the unique characteristic of sea ice, especially in relation to offshore engineering. This includes the most fundamental problem in floating bo ...