Authored

14 records found

This paper develops a multilevel decision making approach based on model predictive control (MPC) for condition-based maintenance of rail. We address a typical railway surface defect called “squat”, in which three maintenance actions can be considered: no maintenance, grinding ...
In this paper, a decision support approach is proposed for condition-based maintenance of rails relying on expert-based systems. The methodology takes into account both the actual conditions of the rails (using axle box acceleration measurements and rail video images) and the pri ...
We consider optimal scheduling of track maintenance activities for a railway network divided into sections. The goal is to find an optimal time schedule for the maintenance activities and optimal routes for the maintenance crew (including all necessary equipment and technicians) ...
We develop a multi-level decision making approach for optimal condition-based maintenance planning of a railway network divided into a large number of sections with independent stochastic deterioration dynamics. At higher level, a chance-constrained Model Predictive Control (MPC) ...
Maintenance is crucial for the proper functioning and lifetime extension of a railway infrastructure network, which is composed of various infrastructures with different functions. In this thesis we develop robust and tractable model-based approaches for maintenance optimization ...
In this paper, distributed optimization approaches are developed for the planning of maintenance operations of large-scale railway infrastructure formulated as a Mixed-Integer Linear Programming (MILP) problem. The proposed planning problem is solved using three different distrib ...
The reverse Stackelberg game provides a suitable decision-making framework for hierarchical control problems like network pricing and toll design. We propose a novel numerical solution approach for systematic computation of optimal nonlinear leader functions, also known as incent ...
The travelling salesman problem forms a basis for many optimisation problems in logistics, finance, and engineering. Several variants exist to accommodate for different problem types. In this paper, we discuss the fixed-destination, multi-depot travelling salesman problem, where ...
The travelling salesman problem forms a basis for many optimisation problems in logistics, finance, and engineering. Several variants exist to accommodate for different problem types. In this paper, we discuss the fixed-destination, multi-depot travelling salesman problem, where ...
This paper develops a multi-level decision making approach for the optimal planning of maintenance operations of railway infrastructures, which are composed of multiple components divided into basic units for maintenance. Scenario-based chance-constrained Model Predictive Control ...
This paper develops a multi-level decision making approach for the optimal planning of maintenance operations of railway infrastructures, which are composed of multiple components divided into basic units for maintenance. Scenario-based chance-constrained Model Predictive Control ...
We develop a Model Predictive Control (MPC) approach for condition-based maintenance planning under uncertainty for railway infrastructure systems composed of multiple components. Piecewise-affine models with uncertain parameters are used to capture both the nonlinearity and unce ...

Contributed

2 records found

Multi-objective project portfolio optimization

Application in railway infrastructure networks

Investment projects in railway infrastructure networks are needed to maintain a high condition of the network, maximize the capacity of the network, and to keep the risk low. Railway organizations are aiming to achieve these goals, but also want to minimize the costs of the inves ...
An essential component of railway infrastructures is track ballast. As railway track is used frequently by passing rolling stocks, its performance degrades over time. At certain degradation levels, maintenance interventions must be carried out to improve the track performance so ...