S. Silvester
Please Note
11 records found
1
Designing a safe and comfortable Super-Pedelec for Spaac Motorized Bicycles
Bridging the gap between speed-pedelec and motorcycles
The Droplet
The next generation of the Polder Roof, a rainwater storage system
A major challenge is to find a good balance between measures preventing an overload of rainwater leading to urban flooding and providing a solution for times when there is a scarcity of water, which currently result in unwanted effects like restrictions for water use.
The Dakdokters is a company that works on a solution for these problems using an underused place, rooftops. Their core business is designing and installing green roofs in order to increase the benefits of greenery in cities. In 2013 they realized that their green roofs could maybe be combined with an open water storage system that could serve as a water buffer. This was the start of a project called “Polder Roof” (polderdak).
The Polder Roof makes use of a WRB (Water Retention Box) layer underneath a green roof. Large amounts of rainwater which would normally be discharged in the sewage system, are temporarily stored in these boxes on the roof. This not only reduces the pressure on the sewage system during periods of heavy rainfall, but the stored water can subsequently be used for e.g. irrigation of the green roof, or for applications like toilet flushing, leading to a decrease in the use of high quality tap water. Technically it is necessary to be able to precisely control the amounts of water stored. This is achieved by a semi-automatic system, called the Smart Flow Control (SFC), which uses various sensors and electric actuation for control. In addition, it can be controlled over the internet by external operators.
Assignment
Currently several prototypes of SFC controlled Polder roofs are installed on 7 different rooftops in Amsterdam. These prototypes function as a proof of concept. However, for the final market implementation some parts of the concept need improvement:
First of all there is the costs aspect. In order to be competitive with other water retention solutions, the Polder Roof should become less expensive per m3 of water storage. A decrease in investment costs as well as in the yearly costs of maintenance and data subscriptions are needed.
Secondly, the current products fail too often, leading to high maintenance costs.
Thirdly, although not important when it comes to functionality, the design of the system must be aesthetically pleasing, especially in cases where the green roof is going to be combined rooftop park-like settings on the rooftop, visited by e.g. personnel of companies.
The assignment of the Dakdokters for the project described here, focused foremost on the design of the regulatory valve and its housing. In the course of the project the rest of the system was also analysed to identify any other optimizations needed.
The outcome of the project can be divided in the following analyses and results:
Step 1: Exploring the context
The input of different stakeholders was obtained in interviews, especially with a view to critically assess the wanted functionalities of the Polder Roof, since a reduction in these could possibly result in a less complex product, reduced parts costs and increased reliability due to less parts that could fail. Not just the market context, but also the technological implications of the roof context was analysed.
Step 2: Analysis of the current product
All current parts were critically analysed with respect to their functionality, costs and reliability. The reliability analysis not only comprised to regular wear through usage, but also to sensitivity to external factors, such as water pollution. These analyses corroborated the idea that the biggest improvements could be made by redesigning the valve and housing of the SFC, concomitantly also improving the installation procedure. The latter is important since in many cases multiple SFC’s need to be placed , due to the fact that roofs are never totally flat but have a slight slope, requiring multiple basins , each with their own SFC for the optimal water storage. Therefore I first concentrated on redesigning the valve and its housing.
Step 3: Analysis of the current product
These analyses led to a personal design vision of the full system. Together with a function map that was checked by the company and its most important partner, Optigroen, this resulted in a complete overview of all desired functionalities of the new Polder Roof and a program of requirements.
Step 4: Product development of the valve and the housing.
Multiple brainstorm sessions resulted in several new ideas, which were evaluated in expert meetings, using prototypes and (CAD)-sketches. I designed a new way of operating the valve, using a rotational actuator. The expensive, non-functional and not very aesthetically pleasing windmill shape of the current housing was simplified into a droplet shape, making it cheaper to produce while still being iconic. This housing was optimized for easy manufacturing and installation and improved safety of the system. These concepts were bundled into a final new concept.
Step 5: Embodying the concept
In the final design phase the concept was further embodied. Several optimizations using tests with a full scale prototype and meetings with experts led to final concept of the SFC which is focused on an easy and cost-effective production and installation process. A concept for the parts needed for the connectivity of all SFC’s on the roof, using a new micro-controller, reducing the investment and yearly costs and a new scenario for the software using rain radar data was designed.
Step 6: Evaluation of the new product.
In the final phase an evaluation was done on the functionality, the reliability, the costs and the aesthetics of the new design. These evaluation proved that a the new design is less expensive, easier to install on different types of roofs, easy to maintain and more reliable. In addition, it proved aesthetically pleasing to the stakeholders.
Apart from these conclusions the results of these evaluations led to recommendations for further development of the SFC, of which the most important is the following: In order to accurately test the new design it is necessary to built a full size test set up with which roof conditions can be simulated. This set-up should including multiple variations in roof lay-out and amount of water storage. It can similarly act as a demonstration model ...
A major challenge is to find a good balance between measures preventing an overload of rainwater leading to urban flooding and providing a solution for times when there is a scarcity of water, which currently result in unwanted effects like restrictions for water use.
The Dakdokters is a company that works on a solution for these problems using an underused place, rooftops. Their core business is designing and installing green roofs in order to increase the benefits of greenery in cities. In 2013 they realized that their green roofs could maybe be combined with an open water storage system that could serve as a water buffer. This was the start of a project called “Polder Roof” (polderdak).
The Polder Roof makes use of a WRB (Water Retention Box) layer underneath a green roof. Large amounts of rainwater which would normally be discharged in the sewage system, are temporarily stored in these boxes on the roof. This not only reduces the pressure on the sewage system during periods of heavy rainfall, but the stored water can subsequently be used for e.g. irrigation of the green roof, or for applications like toilet flushing, leading to a decrease in the use of high quality tap water. Technically it is necessary to be able to precisely control the amounts of water stored. This is achieved by a semi-automatic system, called the Smart Flow Control (SFC), which uses various sensors and electric actuation for control. In addition, it can be controlled over the internet by external operators.
Assignment
Currently several prototypes of SFC controlled Polder roofs are installed on 7 different rooftops in Amsterdam. These prototypes function as a proof of concept. However, for the final market implementation some parts of the concept need improvement:
First of all there is the costs aspect. In order to be competitive with other water retention solutions, the Polder Roof should become less expensive per m3 of water storage. A decrease in investment costs as well as in the yearly costs of maintenance and data subscriptions are needed.
Secondly, the current products fail too often, leading to high maintenance costs.
Thirdly, although not important when it comes to functionality, the design of the system must be aesthetically pleasing, especially in cases where the green roof is going to be combined rooftop park-like settings on the rooftop, visited by e.g. personnel of companies.
The assignment of the Dakdokters for the project described here, focused foremost on the design of the regulatory valve and its housing. In the course of the project the rest of the system was also analysed to identify any other optimizations needed.
The outcome of the project can be divided in the following analyses and results:
Step 1: Exploring the context
The input of different stakeholders was obtained in interviews, especially with a view to critically assess the wanted functionalities of the Polder Roof, since a reduction in these could possibly result in a less complex product, reduced parts costs and increased reliability due to less parts that could fail. Not just the market context, but also the technological implications of the roof context was analysed.
Step 2: Analysis of the current product
All current parts were critically analysed with respect to their functionality, costs and reliability. The reliability analysis not only comprised to regular wear through usage, but also to sensitivity to external factors, such as water pollution. These analyses corroborated the idea that the biggest improvements could be made by redesigning the valve and housing of the SFC, concomitantly also improving the installation procedure. The latter is important since in many cases multiple SFC’s need to be placed , due to the fact that roofs are never totally flat but have a slight slope, requiring multiple basins , each with their own SFC for the optimal water storage. Therefore I first concentrated on redesigning the valve and its housing.
Step 3: Analysis of the current product
These analyses led to a personal design vision of the full system. Together with a function map that was checked by the company and its most important partner, Optigroen, this resulted in a complete overview of all desired functionalities of the new Polder Roof and a program of requirements.
Step 4: Product development of the valve and the housing.
Multiple brainstorm sessions resulted in several new ideas, which were evaluated in expert meetings, using prototypes and (CAD)-sketches. I designed a new way of operating the valve, using a rotational actuator. The expensive, non-functional and not very aesthetically pleasing windmill shape of the current housing was simplified into a droplet shape, making it cheaper to produce while still being iconic. This housing was optimized for easy manufacturing and installation and improved safety of the system. These concepts were bundled into a final new concept.
Step 5: Embodying the concept
In the final design phase the concept was further embodied. Several optimizations using tests with a full scale prototype and meetings with experts led to final concept of the SFC which is focused on an easy and cost-effective production and installation process. A concept for the parts needed for the connectivity of all SFC’s on the roof, using a new micro-controller, reducing the investment and yearly costs and a new scenario for the software using rain radar data was designed.
Step 6: Evaluation of the new product.
In the final phase an evaluation was done on the functionality, the reliability, the costs and the aesthetics of the new design. These evaluation proved that a the new design is less expensive, easier to install on different types of roofs, easy to maintain and more reliable. In addition, it proved aesthetically pleasing to the stakeholders.
Apart from these conclusions the results of these evaluations led to recommendations for further development of the SFC, of which the most important is the following: In order to accurately test the new design it is necessary to built a full size test set up with which roof conditions can be simulated. This set-up should including multiple variations in roof lay-out and amount of water storage. It can similarly act as a demonstration model
Parking / Charging system based on the new urban sharing e-bike business model, Urbee
Next-gen Urbee docking station
A nomadic docking station, semi-permanent, architecture which can fit to different given spaces with high adaptability is proposed in this report. To meet the diverse demands of private BSS in the future, the implementation of system should be flexible. The modularized docking station provides four main types of efficient parking configurations. The amount of bikes is changeable depending on the space dimension. The non-excavating installation allows the station can be relocated easily. All these parking configurations can be constructed with the same set of station components.
The image of the next-gen Urbee docking station can be determined after the project. A lower threshold for implement Urbee system for customers, which also helps Urbee to increase the business expandability. A higher mobility and adaptability that system could be quickly adjusted, according to diverse environments and needs. The higher smartised system which provide more intuitive and easier user experience.
...
A nomadic docking station, semi-permanent, architecture which can fit to different given spaces with high adaptability is proposed in this report. To meet the diverse demands of private BSS in the future, the implementation of system should be flexible. The modularized docking station provides four main types of efficient parking configurations. The amount of bikes is changeable depending on the space dimension. The non-excavating installation allows the station can be relocated easily. All these parking configurations can be constructed with the same set of station components.
The image of the next-gen Urbee docking station can be determined after the project. A lower threshold for implement Urbee system for customers, which also helps Urbee to increase the business expandability. A higher mobility and adaptability that system could be quickly adjusted, according to diverse environments and needs. The higher smartised system which provide more intuitive and easier user experience.
Future solar home systems
Matching energy supply with energy demand
Insert Cargo Associated Metaphor Here
Mobilising Urban Businesses in a Cleaner, Smarter Way
Urban Arrow (UA) offers slender alternatives in the form of high quality, modular, electric cargo bikes. Whereas their Family bike is a holistic product, the Cargo lacks refinement and character. Particularly in the rapidly growing market, a new level cargo case with a clear identity is imperative.
User research shows that mainly a combination of improvements in function and workflow is desired. Research on aesthetics presented implementing automotive styling is applicable, for taking its design to the next step.
Extensive sketching and CAD with an automotive styling mindset, led to a multifunctional, holistic case. A sound and secure container with 430L of room (versus the former 300L), that doubles as a flatbed carrier for unwieldy cargo. The panels allow to be flat packed when pre-assembled, the basalt composite material allows easy modifications and additions. Workflow is improved by employing a two-part lid and adding a more adaptable lock mechanism. The use of basalt fibre composite makes for a strong yet thin body, and that modifications be possible. ...
Urban Arrow (UA) offers slender alternatives in the form of high quality, modular, electric cargo bikes. Whereas their Family bike is a holistic product, the Cargo lacks refinement and character. Particularly in the rapidly growing market, a new level cargo case with a clear identity is imperative.
User research shows that mainly a combination of improvements in function and workflow is desired. Research on aesthetics presented implementing automotive styling is applicable, for taking its design to the next step.
Extensive sketching and CAD with an automotive styling mindset, led to a multifunctional, holistic case. A sound and secure container with 430L of room (versus the former 300L), that doubles as a flatbed carrier for unwieldy cargo. The panels allow to be flat packed when pre-assembled, the basalt composite material allows easy modifications and additions. Workflow is improved by employing a two-part lid and adding a more adaptable lock mechanism. The use of basalt fibre composite makes for a strong yet thin body, and that modifications be possible.
From New to Normal
Designing for product category legitimacy