B.M. van Breukelen
Please Note
19 records found
1
The Pernis polder in Rotterdam was selected as the study area. Surrounded by flood barriers, the Pernis surface water system functions as a closed system, where freshwater enters through an inlet structure and is discharged from the polder by pumping. An integrated catchment model was developed in InfoWorks ICM to simulate chloride concentrations throughout the surface water system by combining hydrological, hydraulic, and water quality processes.
Two mitigation strategies were evaluated and compared with the current water system configuration and flushing practice. The first strategy involved real-time control (RTC) of the inlet structure, restricting flushing to periods with low chloride concentrations in the source water. The second strategy consisted of stormwater separation, providing stormwater runoff as a dilution source. Simulation results showed that RTC reduced chloride concentrations below ecologically relevant thresholds for several weeks during the 75-day simulations. Mean chloride concentrations at the downstream pumping station decreased by 423–501 mg/L, while peak concentrations were reduced by up to 1,900 mg/L. These findings indicate that RTC is a mitigation measure of ecological and regulatory relevance. In contrast, stormwater separation produced negligible average chloride reductions and lowered concentrations below ecological thresholds only briefly following high-intensity rainfall events. As a standalone measure, this strategy was therefore found to be ineffective.
Furthermore, RTC was further assessed under a synthetic future worst-case climate scenario (i.e. KNMI’24 Hd scenario for the year 2085), incorporating increased saline groundwater seepage and sea level rise impacts on the Nieuwe Maas. Although RTC continued to substantially reduce chloride concentrations, levels remained above ecologically relevant thresholds throughout the simulation period, indicating that RTC alone is unlikely to prevent future salinization.
Overall, this study concludes that integrated water quality and hydraulic modelling is a valuable decision-support tool for assessing salinization and developing effective future water quality and water quantity mitigation strategies in Rotterdam’s urban water system. ...
The Pernis polder in Rotterdam was selected as the study area. Surrounded by flood barriers, the Pernis surface water system functions as a closed system, where freshwater enters through an inlet structure and is discharged from the polder by pumping. An integrated catchment model was developed in InfoWorks ICM to simulate chloride concentrations throughout the surface water system by combining hydrological, hydraulic, and water quality processes.
Two mitigation strategies were evaluated and compared with the current water system configuration and flushing practice. The first strategy involved real-time control (RTC) of the inlet structure, restricting flushing to periods with low chloride concentrations in the source water. The second strategy consisted of stormwater separation, providing stormwater runoff as a dilution source. Simulation results showed that RTC reduced chloride concentrations below ecologically relevant thresholds for several weeks during the 75-day simulations. Mean chloride concentrations at the downstream pumping station decreased by 423–501 mg/L, while peak concentrations were reduced by up to 1,900 mg/L. These findings indicate that RTC is a mitigation measure of ecological and regulatory relevance. In contrast, stormwater separation produced negligible average chloride reductions and lowered concentrations below ecological thresholds only briefly following high-intensity rainfall events. As a standalone measure, this strategy was therefore found to be ineffective.
Furthermore, RTC was further assessed under a synthetic future worst-case climate scenario (i.e. KNMI’24 Hd scenario for the year 2085), incorporating increased saline groundwater seepage and sea level rise impacts on the Nieuwe Maas. Although RTC continued to substantially reduce chloride concentrations, levels remained above ecologically relevant thresholds throughout the simulation period, indicating that RTC alone is unlikely to prevent future salinization.
Overall, this study concludes that integrated water quality and hydraulic modelling is a valuable decision-support tool for assessing salinization and developing effective future water quality and water quantity mitigation strategies in Rotterdam’s urban water system.
Monitoring Hydrocarbon Pollution Plumes in Groundwater
Sensor Data Fusion using Machine Learning
PHC compounds are highly toxic and carcinogenic, posing risks to human health and the environment upon exposure. Although groundwater serves as a major drinking water source, drinking water wells are monitored only quarterly or yearly for PHC contamination. Conventional monitoring relies on time-consuming manual sampling and costly laboratory analysis. Sensors exist for directly detecting and measuring PHC levels in the field, but most of these sensors remain experimental and/or expensive.
Microbial communities in aquifers can degrade and thereby attenuate PHCs, making monitored natural attenuation a preferred long-term management strategy for PHC contaminated sites. This is especially the case when active remediation (e.g., pump-and-treat or excavation) is technically challenging or costly. However, there is still a gap for cost-effective tools for real-time, continuous groundwater monitoring for PHC contamination... ...
PHC compounds are highly toxic and carcinogenic, posing risks to human health and the environment upon exposure. Although groundwater serves as a major drinking water source, drinking water wells are monitored only quarterly or yearly for PHC contamination. Conventional monitoring relies on time-consuming manual sampling and costly laboratory analysis. Sensors exist for directly detecting and measuring PHC levels in the field, but most of these sensors remain experimental and/or expensive.
Microbial communities in aquifers can degrade and thereby attenuate PHCs, making monitored natural attenuation a preferred long-term management strategy for PHC contaminated sites. This is especially the case when active remediation (e.g., pump-and-treat or excavation) is technically challenging or costly. However, there is still a gap for cost-effective tools for real-time, continuous groundwater monitoring for PHC contamination...
A principal challenge to this strategy is the poor quality of Tile Drainage Water (TDW), which is characterized by elevated concentrations of suspended solids, nitrates (NO₃), phosphates (PO₄), and pesticides. These constituents pose a dual challenge: they risk clogging ASR infiltration wells, complicating operation and maintenance (O&M), and they frequently exceed the water quality standards mandated by the Dutch Water Board for aquifer infiltration.
This report, therefore, aimed to develop, test, and evaluate a robust, low-cost, and low-maintenance pre-treatment system to render TDW suitable for ASR. The research objectives were fourfold:
(1) to design, install, and operate a pilot-scale treatment system;
(2) to investigate, through complementary laboratory-scale experiments, the mechanisms of phosphate removal;
(3) to develop predictive models for nitrate removal; and
(4) to conduct a comprehensive techno-economic assessment of the system's feasibility.
A pilot Sandwich Sand and Carbon Filter (SSCF) was installed at an agricultural site in Hoofdweg, Texel, Netherlands. Initial results confirmed its efficacy in reducing pesticide concentrations to below 0.1 μg/L, with the initial regulatory limit being 0.5 μg/L. However, the subsequent reformation of requirements by the local water board in 2024 introduced the requirement of also reducing nitrate (<5.6 mg/L) and phosphate (<0.4 mg/L) before infiltration, necessitating a system modification that was not anticipated during the initial 2023 conception phase.
During this EngD project, the SSCF filter was modified to meet the new requirements. Laboratory tests were carried out, identifying iron-coated sand (ICS) as an effective phosphate adsorbent, which was subsequently used to successfully design and retrofit the existing SSCF. Post-modification monitoring confirmed consistent phosphate removal to concentrations below the 0.4 mg/L standard. While a denitrifying woodchip bioreactor (DN-WB) was designed for potential nitrate removal, its implementation was deemed unnecessary as field nitrate levels consistently remained below the regulatory threshold of 5.6 mg/l.
The performance of the optimized SSCF system was validated through weekly sampling and analysis during operational periods. A techno-economic evaluation further demonstrated that the integrated pre-treatment solution is not only technically viable but also cost-effective and environmentally favorable when compared to alternative water management and treatment strategies.
In conclusion, this thesis provides a validated, scalable, and climate-adaptive solution for sustainable agricultural water management. It makes a significant contribution to the field by demonstrating a practical method to overcome the qualitative barriers to using captured TDW via an ASR system. The findings indicate that with appropriate pre-treatment, ASR systems can be effectively deployed to enhance water security and build resilience in the coastal agricultural sectors of the Netherlands, where the reliance on seasonal rainfall is a fundamental challenge. ...
A principal challenge to this strategy is the poor quality of Tile Drainage Water (TDW), which is characterized by elevated concentrations of suspended solids, nitrates (NO₃), phosphates (PO₄), and pesticides. These constituents pose a dual challenge: they risk clogging ASR infiltration wells, complicating operation and maintenance (O&M), and they frequently exceed the water quality standards mandated by the Dutch Water Board for aquifer infiltration.
This report, therefore, aimed to develop, test, and evaluate a robust, low-cost, and low-maintenance pre-treatment system to render TDW suitable for ASR. The research objectives were fourfold:
(1) to design, install, and operate a pilot-scale treatment system;
(2) to investigate, through complementary laboratory-scale experiments, the mechanisms of phosphate removal;
(3) to develop predictive models for nitrate removal; and
(4) to conduct a comprehensive techno-economic assessment of the system's feasibility.
A pilot Sandwich Sand and Carbon Filter (SSCF) was installed at an agricultural site in Hoofdweg, Texel, Netherlands. Initial results confirmed its efficacy in reducing pesticide concentrations to below 0.1 μg/L, with the initial regulatory limit being 0.5 μg/L. However, the subsequent reformation of requirements by the local water board in 2024 introduced the requirement of also reducing nitrate (<5.6 mg/L) and phosphate (<0.4 mg/L) before infiltration, necessitating a system modification that was not anticipated during the initial 2023 conception phase.
During this EngD project, the SSCF filter was modified to meet the new requirements. Laboratory tests were carried out, identifying iron-coated sand (ICS) as an effective phosphate adsorbent, which was subsequently used to successfully design and retrofit the existing SSCF. Post-modification monitoring confirmed consistent phosphate removal to concentrations below the 0.4 mg/L standard. While a denitrifying woodchip bioreactor (DN-WB) was designed for potential nitrate removal, its implementation was deemed unnecessary as field nitrate levels consistently remained below the regulatory threshold of 5.6 mg/l.
The performance of the optimized SSCF system was validated through weekly sampling and analysis during operational periods. A techno-economic evaluation further demonstrated that the integrated pre-treatment solution is not only technically viable but also cost-effective and environmentally favorable when compared to alternative water management and treatment strategies.
In conclusion, this thesis provides a validated, scalable, and climate-adaptive solution for sustainable agricultural water management. It makes a significant contribution to the field by demonstrating a practical method to overcome the qualitative barriers to using captured TDW via an ASR system. The findings indicate that with appropriate pre-treatment, ASR systems can be effectively deployed to enhance water security and build resilience in the coastal agricultural sectors of the Netherlands, where the reliance on seasonal rainfall is a fundamental challenge.
Revitalising Urban Curaçao
A climate resilient plan for Wilhelminaplein in Punda
interventions are proposed for Wilhelminaplein in Punda to mitigate the problem of heat stress, along with socioeconomic issues. This is done while keeping the problem of water scarcity in mind. Among various problem locations in the Inner-City, Wilhelminaplein was chosen as a development site because of its high potential and advantageous location. The main problems facing Wilhelminaplein are found to be extreme heat and lack of clear function, shade and maintenance.
Various possible solutions are proposed and discussed with experts, including a landscape architect and urban planner. Following this, the interventions are finalized and presented to various stakeholders, including representatives of relevant government agencies. Through a workshop, the stakeholders provided feedback on their preferred set of interventions.
The proposed interventions are subdivided into ’quick wins’, cool spots and additional interventions.
To quantify the effectiveness of the interventions, PET reductions of the proposed interventions are modelled using the modelling software RayMan. Along with the PET reduction, the initial cost, water usage, required level of maintenance and implementation time frame, are analysed for each proposed intervention.
To facilitate the practical implementation of the proposed interventions, an overview is given of which steps the relevant government agencies still need to take in terms of research, designs, and applying for permits.
...
interventions are proposed for Wilhelminaplein in Punda to mitigate the problem of heat stress, along with socioeconomic issues. This is done while keeping the problem of water scarcity in mind. Among various problem locations in the Inner-City, Wilhelminaplein was chosen as a development site because of its high potential and advantageous location. The main problems facing Wilhelminaplein are found to be extreme heat and lack of clear function, shade and maintenance.
Various possible solutions are proposed and discussed with experts, including a landscape architect and urban planner. Following this, the interventions are finalized and presented to various stakeholders, including representatives of relevant government agencies. Through a workshop, the stakeholders provided feedback on their preferred set of interventions.
The proposed interventions are subdivided into ’quick wins’, cool spots and additional interventions.
To quantify the effectiveness of the interventions, PET reductions of the proposed interventions are modelled using the modelling software RayMan. Along with the PET reduction, the initial cost, water usage, required level of maintenance and implementation time frame, are analysed for each proposed intervention.
To facilitate the practical implementation of the proposed interventions, an overview is given of which steps the relevant government agencies still need to take in terms of research, designs, and applying for permits.
Groundwater Quality in Curaçao
A hydrochemical multi-annual assessment (1977-2021) of a Caribbean island
Urban Wastewater Management of Willemstad, Curaçao, and Environmental Implications
A qualitative and quantitative investigation on urban wastewater fluxes
The objective of this research is to determine the optimal retention time for the biofilter to achieve the best water quality while maximizing the total amount of water to be recharged by controlling the pump. This thesis includes water quality measurement and water quantity simulation. In the water quality part, the performance of the biofilter at different retention time (2, 6, 16, and 24 hours) is evaluated in terms of the removal efficiency of turbidity, nutrients (nitrate and phosphorus), dissolved and particulate metals (Mn, Ca, Mg, Ba, Zn), UV254 and DOC with two different influent types (surface water and stormwater). In the water quantity part, Cromvliet Park, with an 8000 m2 collection area, was modelled using Python and SWMM to operate the biofilter with various retention time under one year of rainfall data (total rainfall 731mm). This modelling was done to calculate the total water volume available for recharge. The sections on water quality and quantity were integrated by controlling and evaluating the biofilter based on the retention time.
The results indicate that the efficiency of the biofilter's pollutant removal is influenced by several factors. Turbidity (40-90%) is effectively removed by the filtration in the biofilter. Nitrate removal efficiency was 12-49% with short retention times (2-6 hours) but fluctuated with longer durations (16-24 hours), decreasing to -84-13% and then changing to -6-0%. Measurements of dissolved oxygen in the effluent indicated that an increase in nitrate removal efficiency due to nitrification happened with longer retention time. For dissolved zinc, removal efficiency ranged from 10-60% with stormwater influent and 0-100% with surface water because of the adsorption competition of metals. Combined with the water quantity calculations performed in SWMM, it is advisable to set the optimal retention time for the biofilter at 4–6 hours. This duration allows for the maximization of water reuse while maintaining high nitrate removal efficiency. ...
The objective of this research is to determine the optimal retention time for the biofilter to achieve the best water quality while maximizing the total amount of water to be recharged by controlling the pump. This thesis includes water quality measurement and water quantity simulation. In the water quality part, the performance of the biofilter at different retention time (2, 6, 16, and 24 hours) is evaluated in terms of the removal efficiency of turbidity, nutrients (nitrate and phosphorus), dissolved and particulate metals (Mn, Ca, Mg, Ba, Zn), UV254 and DOC with two different influent types (surface water and stormwater). In the water quantity part, Cromvliet Park, with an 8000 m2 collection area, was modelled using Python and SWMM to operate the biofilter with various retention time under one year of rainfall data (total rainfall 731mm). This modelling was done to calculate the total water volume available for recharge. The sections on water quality and quantity were integrated by controlling and evaluating the biofilter based on the retention time.
The results indicate that the efficiency of the biofilter's pollutant removal is influenced by several factors. Turbidity (40-90%) is effectively removed by the filtration in the biofilter. Nitrate removal efficiency was 12-49% with short retention times (2-6 hours) but fluctuated with longer durations (16-24 hours), decreasing to -84-13% and then changing to -6-0%. Measurements of dissolved oxygen in the effluent indicated that an increase in nitrate removal efficiency due to nitrification happened with longer retention time. For dissolved zinc, removal efficiency ranged from 10-60% with stormwater influent and 0-100% with surface water because of the adsorption competition of metals. Combined with the water quantity calculations performed in SWMM, it is advisable to set the optimal retention time for the biofilter at 4–6 hours. This duration allows for the maximization of water reuse while maintaining high nitrate removal efficiency.
Influence of Hydrological Processes on Phosphate Leaching in Tile Drained Sandy Soils
A Case Study in the Bollenstreek
Bluebloqs as a circular water solution
A framework to co-design the dimensioning and operations of the decentralised Bluebloqs system
The existing centralised infrastructure consists of three reliable systems. The first system supplies highquality water, the second drains out stormwater and the third one discharges wastewater. These three systems operate separately from each other and follow a linear approach to
water management. In recent years, circular water management has become more prevalent. Instead of following a linear approach in the three separate systems, the reuse of water flows as viable sources are applied more often. New, often local, solutions can be designed to effectively complement existing systems in maintaining the high provision of water services that societies have consistently been using over the past decade. This circular approach can ensure that current water requirement levels can be met sustainably by the improved urban water systems.
By dealing with the upcoming challenges of highintensity rainfall and long periods of drought– which both have a high spatial variability – local solutions are able to support the centralised infrastructure. This is done by both mitigating the pluvial flood risk, as well as by providing a high quality water source. An arguably ideal solution which addresses both the pluvial flood risk and also provides a highquality water source, is the Bluebloqs system. The Bluebloqs system can help mitigate pluvial flood risk by the attenuation of flow, the result of implementing an attenuation tank in the stormwater drainage system. Also, the Bluebloqs system is able to filter and store this stormwater to provide a highquality water source during waterscarce seasons.
Whether the Bluebloqs system is a viable solution which addresses both the mitigation of the pluvial flood risk as well as the provision of water challenge, is investigated in this research. The Bluebloqs system is a circular water solution that makes use of an attenuation tank, a biofilter and an aquifer storage and recovery (ASR) system. The attenuation tank is physically connected to the drainage system and it consequently decreases the risk of surcharged pipes in the drainage network. From the attenuation tank, the water is pumped towards the biofilter, where pollutants from the water are removed and the water is filtered to such an extent that it can be infiltrated into the aquifer. In the aquifer, the water is stored to overcome seasonal variations in water availability. The Bluebloqs system has the objective to supply water in the dry season, even though its source is stormwater, which enters the system during the wet season. This research has analysed the performance of the Bluebloqs system for different dimensions and operations.
Within this thesis, a framework has been built that presents the performance of the Bluebloqssystem. This framework consists of three groups; the interactions with centralised infrastructure, the water quality indicators and the impact of the Bluebloqs system on its environment. These three have their own distinct performance indicators, which characterise the effectiveness of the Bluebloqs system in providing a specific water service. The group of the framework dealing with the interactions with the centralised infrastructure uses performance indicators for the volume of water lost in overflow events, and volume of water supplied through the Bluebloqs system as high quality water source to the enduser. The indicators for the other groups characterise the Bluebloqs system differently. Each group within the framework projects the performance of the Bluebloqs system for other interest groups. For example, the indicators regarding the impact of the Bluebloqs system on its environment are of interest to municipalities thinking about implementing the system.
The behaviour of the Bluebloqs system has been modelled. This model presents the physical processes taking place within the Bluebloqs system. The output of the model are the performance indicators of the framework. By running the model under different input parameters, the performance of the modelled Bluebloqs system is tested on the three groups of the framework.
The outcome of testing the model on the framework has shown that the Bluebloqs system can be improved. One of the suggested improvements is to work with feed cycles for the biofilter. These feed cycles consist of the periodic saturation of the biofilter. Once the biofilter is saturated, the flow from the attenuation tank towards the biofilter is interrupted, to let the water gradually filter through the biofilter.
By applying feed cycles, the biofilter is better capable of removing pollutants from the water. However, periodically interrupting the water flow from the attenuation tank towards the biofilter negatively impacts the effective storage capacity of the attenuation tank. When having more feed cycles in a day, these interruptions last for a shorter period of time. Depending on the desired performance of the system, which is based on the performance indicators, these feed cycles should be aligned with the capacity of the attenuation tank and the discharge of the pump for the flow between the attenuation tank and the biofilter.
Fitting the feed cycles to the seasonality of rainfall patterns can further increase the performance of the system in mitigating flood risks. Applying predictive control when overflow events occur is an additional control option that minimises the environmental impact of the system. Finally, the performance of the Bluebloqs system can be presented based on all the performance indicators included in the framework, and the model can be used to adjust the system dimensioning and operations to present the consequences of adjustments to the desired performance of the Bluebloqs system.
The frameworks’ performance indicators can be used to understand the Bluebloqs ideal configuration to deliver a specific desired performance. The desired performance of the system determines the dimensions and operations of the system. Codesigning the Bluebloqs system is thus crucial to its delivered performance.
In conclusion, the framework and model can be used to present the Bluebloqs system for different scenarios. The framework can generate a comprehensive overview of what can be expected of the Bluebloqs system when implementing it in a specific project site, in comparison to other solutions that may be considered, such as green roofs or storage tanks. Also, its use as circular solution being complementary to existing urban water infrastructure can be presented by the framework and model output. This will help in the transition of urban water systems in dealing with the upcoming challenges related to climate change, the deterioration of the piped infrastructure and the depletion of water sources. ...
The existing centralised infrastructure consists of three reliable systems. The first system supplies highquality water, the second drains out stormwater and the third one discharges wastewater. These three systems operate separately from each other and follow a linear approach to
water management. In recent years, circular water management has become more prevalent. Instead of following a linear approach in the three separate systems, the reuse of water flows as viable sources are applied more often. New, often local, solutions can be designed to effectively complement existing systems in maintaining the high provision of water services that societies have consistently been using over the past decade. This circular approach can ensure that current water requirement levels can be met sustainably by the improved urban water systems.
By dealing with the upcoming challenges of highintensity rainfall and long periods of drought– which both have a high spatial variability – local solutions are able to support the centralised infrastructure. This is done by both mitigating the pluvial flood risk, as well as by providing a high quality water source. An arguably ideal solution which addresses both the pluvial flood risk and also provides a highquality water source, is the Bluebloqs system. The Bluebloqs system can help mitigate pluvial flood risk by the attenuation of flow, the result of implementing an attenuation tank in the stormwater drainage system. Also, the Bluebloqs system is able to filter and store this stormwater to provide a highquality water source during waterscarce seasons.
Whether the Bluebloqs system is a viable solution which addresses both the mitigation of the pluvial flood risk as well as the provision of water challenge, is investigated in this research. The Bluebloqs system is a circular water solution that makes use of an attenuation tank, a biofilter and an aquifer storage and recovery (ASR) system. The attenuation tank is physically connected to the drainage system and it consequently decreases the risk of surcharged pipes in the drainage network. From the attenuation tank, the water is pumped towards the biofilter, where pollutants from the water are removed and the water is filtered to such an extent that it can be infiltrated into the aquifer. In the aquifer, the water is stored to overcome seasonal variations in water availability. The Bluebloqs system has the objective to supply water in the dry season, even though its source is stormwater, which enters the system during the wet season. This research has analysed the performance of the Bluebloqs system for different dimensions and operations.
Within this thesis, a framework has been built that presents the performance of the Bluebloqssystem. This framework consists of three groups; the interactions with centralised infrastructure, the water quality indicators and the impact of the Bluebloqs system on its environment. These three have their own distinct performance indicators, which characterise the effectiveness of the Bluebloqs system in providing a specific water service. The group of the framework dealing with the interactions with the centralised infrastructure uses performance indicators for the volume of water lost in overflow events, and volume of water supplied through the Bluebloqs system as high quality water source to the enduser. The indicators for the other groups characterise the Bluebloqs system differently. Each group within the framework projects the performance of the Bluebloqs system for other interest groups. For example, the indicators regarding the impact of the Bluebloqs system on its environment are of interest to municipalities thinking about implementing the system.
The behaviour of the Bluebloqs system has been modelled. This model presents the physical processes taking place within the Bluebloqs system. The output of the model are the performance indicators of the framework. By running the model under different input parameters, the performance of the modelled Bluebloqs system is tested on the three groups of the framework.
The outcome of testing the model on the framework has shown that the Bluebloqs system can be improved. One of the suggested improvements is to work with feed cycles for the biofilter. These feed cycles consist of the periodic saturation of the biofilter. Once the biofilter is saturated, the flow from the attenuation tank towards the biofilter is interrupted, to let the water gradually filter through the biofilter.
By applying feed cycles, the biofilter is better capable of removing pollutants from the water. However, periodically interrupting the water flow from the attenuation tank towards the biofilter negatively impacts the effective storage capacity of the attenuation tank. When having more feed cycles in a day, these interruptions last for a shorter period of time. Depending on the desired performance of the system, which is based on the performance indicators, these feed cycles should be aligned with the capacity of the attenuation tank and the discharge of the pump for the flow between the attenuation tank and the biofilter.
Fitting the feed cycles to the seasonality of rainfall patterns can further increase the performance of the system in mitigating flood risks. Applying predictive control when overflow events occur is an additional control option that minimises the environmental impact of the system. Finally, the performance of the Bluebloqs system can be presented based on all the performance indicators included in the framework, and the model can be used to adjust the system dimensioning and operations to present the consequences of adjustments to the desired performance of the Bluebloqs system.
The frameworks’ performance indicators can be used to understand the Bluebloqs ideal configuration to deliver a specific desired performance. The desired performance of the system determines the dimensions and operations of the system. Codesigning the Bluebloqs system is thus crucial to its delivered performance.
In conclusion, the framework and model can be used to present the Bluebloqs system for different scenarios. The framework can generate a comprehensive overview of what can be expected of the Bluebloqs system when implementing it in a specific project site, in comparison to other solutions that may be considered, such as green roofs or storage tanks. Also, its use as circular solution being complementary to existing urban water infrastructure can be presented by the framework and model output. This will help in the transition of urban water systems in dealing with the upcoming challenges related to climate change, the deterioration of the piped infrastructure and the depletion of water sources.
Van Hondsbossche dijk naar Hondsbossche duinen
Een modelstudie naar de effecten van een zandsuppletie op het grondwater regime
Fate of Escherichia coli, Enterococci, and Campylobacter in the Bluebloqs Biofilter
Urban Waterbuffer Spangen, Rotterdam
Improving water efficiency and crop yield on a sugarcane plantation in Xinavane, Mozambique
An analysis of irrigation practices, yield variability and the potential of a decision support system
Duna & Água
Inhambane, Mozambique
The aim of this study was to find the best kinetic calcite dissolution model in order to understand the calcite grains dissolution behavior inside the filter and subsequently to adequately design and operate the calcite filter. Therefore, extensive pilot research was conducted to investigate the effect of various parameters on calcite dissolution such as the calcite grain size, velocity and carbon dioxide concentration. On top of that, the dissolution was modelled based on a successful empirical expression given by Yamauchi et al. (1987). However, it was found that the effect of the flow rate on the diffusion boundary layer around the calcite grains has not been taken into account in the study carried out by Yamauchi et al. (1987). Therefore, the effect of velocity on the calcite dissolution coefficient was investigated at five different velocity ,i.e., 5, 10,15,20,30 m/h. From there, a function was developed to describe the correlation between flow rate and the dissolution rate coefficient. In order to calculate the equilibrium concentration, the chemical reactions were simulated using PhreeqPython (Phreeqc built in Python).
The main difference of this study compare to previous investigations was the low temperature of the water (12 oC vs 22-40 oC) and the smaller grain size of the calcite (0.5-1.2 mm vs 1-2 and 2-3mm) which was tested. Besides that a high range of CO2 dosing (1.45- 9.5 mmol/l) was tested. As expected from theory, the dissolution rates was strongly affected by the varied parameters. It is concluded that the smaller grain size of 0.5-1.2 mm reduced the required empty bed contact time (EBCT) to15 min where operating the filter with the larger grain size of 1-2mm needs a minimum EBCT of 25 min to reach calcite equilibrium. The CO2 dosing is recommended to be less than 3 mmol/l, since the CO2 efficiency will drop under the 60% at higher CO2 concentrations.
Eventually, the optimal design will be introduced for the remineralisation process at Oasen treatment plant De Hooge Boom located in Kamerik. For this purpose various operational scenarios were compared on capital and operational cost. The overall cost including, both Capital expenses (CAPEX) and Operational expenses OPEX, was estimated between € 0.048 and 0.064 per m3 for different scenario’s where 71% consists of investment cost. The total treatment cost of this design is 0.057 €/m3 and the investment cost was found to be € 1.351.000 which is 32% less than price estimated by previous study done by Oasen.
...
The aim of this study was to find the best kinetic calcite dissolution model in order to understand the calcite grains dissolution behavior inside the filter and subsequently to adequately design and operate the calcite filter. Therefore, extensive pilot research was conducted to investigate the effect of various parameters on calcite dissolution such as the calcite grain size, velocity and carbon dioxide concentration. On top of that, the dissolution was modelled based on a successful empirical expression given by Yamauchi et al. (1987). However, it was found that the effect of the flow rate on the diffusion boundary layer around the calcite grains has not been taken into account in the study carried out by Yamauchi et al. (1987). Therefore, the effect of velocity on the calcite dissolution coefficient was investigated at five different velocity ,i.e., 5, 10,15,20,30 m/h. From there, a function was developed to describe the correlation between flow rate and the dissolution rate coefficient. In order to calculate the equilibrium concentration, the chemical reactions were simulated using PhreeqPython (Phreeqc built in Python).
The main difference of this study compare to previous investigations was the low temperature of the water (12 oC vs 22-40 oC) and the smaller grain size of the calcite (0.5-1.2 mm vs 1-2 and 2-3mm) which was tested. Besides that a high range of CO2 dosing (1.45- 9.5 mmol/l) was tested. As expected from theory, the dissolution rates was strongly affected by the varied parameters. It is concluded that the smaller grain size of 0.5-1.2 mm reduced the required empty bed contact time (EBCT) to15 min where operating the filter with the larger grain size of 1-2mm needs a minimum EBCT of 25 min to reach calcite equilibrium. The CO2 dosing is recommended to be less than 3 mmol/l, since the CO2 efficiency will drop under the 60% at higher CO2 concentrations.
Eventually, the optimal design will be introduced for the remineralisation process at Oasen treatment plant De Hooge Boom located in Kamerik. For this purpose various operational scenarios were compared on capital and operational cost. The overall cost including, both Capital expenses (CAPEX) and Operational expenses OPEX, was estimated between € 0.048 and 0.064 per m3 for different scenario’s where 71% consists of investment cost. The total treatment cost of this design is 0.057 €/m3 and the investment cost was found to be € 1.351.000 which is 32% less than price estimated by previous study done by Oasen.