F.H.M. van de Ven
Please Note
35 records found
1
Sediment and Phosphorus Removal in a Decentralized Stormwater Treatment System
Assessing the performance of a modified SediSubstrator L in the city of Amsterdam
The SediSubstrator L is a decentralized stormwater treatment device installed as a pre-treatment step to mitigate clogging in a storage and infiltration system on the Rooseveltlaan in Amsterdam. It consists of a sedimentation pipe with a flow-separating grate, the SediPipe, and a filter-adsorbent, the SediSorp+. It is purported to remove 80 % of TSS by DiBT (the technical authority in the German construction sector) test principles that use Millisil®W4 to simulate real sediments. The full-scale unit was monitored in the city throughout May-September 2022 to assess its performance.
The stormwater runoff discharged from the catchment had high concentrations of lead (54 μg/L) and zinc (790 μg/L), likely due to contact with gutters and old roofing material, amplified by the relative contribution of these roofs to the total catchment discharge (accounting for 50 % of the area contributing to runoff). The sediment (TSS) concentration was low, equivalent to 20 mg/L on average. The sediments were also light and fine—with an organic fraction of 66 % and with 78 % of diameter smaller than 63 μm.
In the SediSubstrator L, the TSS removal efficiency was 34 % on average. This corresponds to an estimated caught load of 2.7 kg for this period. The removal efficiency was shown to increase with an increasing stormwater TSS concentration, with longer antecedent dry periods and with lower TSS organic fractions. Turbidity dynamics in the system suggest that while a net sequestration of solids occurs in the SediPipe, there is a resuspension of fine solids. This was observed in a camera inspection to occur from solids which settle on or near the grate. In an extreme rainfall event on September 28th 2022, water collected on the section of the street connected to the SediSubstrator, the cause of which is still subject to speculation. The observed SediSorp+ filter resistance across the summer was not indicative of gradual clogging, but an inspection showed signs of decayed organic matter throughout the full length of the filter bedas well as traces of cement in two of the four cartridges. It is possible that these two effects together with turbulent inflows prompted the acute clogging behavior.
There is interest in using the SediSubstrator beyond the city of Amsterdam to reduce phosphorus loadings in the road runoff discharged to sensitive nature areas. On the Rooseveltlaan, the average total phosphorus removal efficiency was 18 % (50 % for dissolved, readily bioavailable ortho-phosphate). Interactions with settled sediments generated ortho-phosphate in the SediPipe, and fine particulate and colloidal organic phosphorus was shown remobilized in both the SediPipe and SediSorp+. The removal of ortho-phosphate in theSediSorp+ in natural rainfall was good (on average 50 %) and was shown to be consistent at different contact times (approximately 10-30 minutes).
The installed unit should be monitored over a longer time period of two years for statistical significance and to capture seasonal variation in loads. Nevertheless, the removal efficiency observed on site is consistent with the results of a sedimentation model developed according to Ferguson & Church (2004), using a stormwater sediment particle density as measured at another location in the city. Design adaptations are recommended to improve the SediSubstrator L to the conditions observed in Amsterdam: namely, better site selection, a longer SediPipe section (24 m) and a second filter stage to better capture the fine suspended solids. ...
The SediSubstrator L is a decentralized stormwater treatment device installed as a pre-treatment step to mitigate clogging in a storage and infiltration system on the Rooseveltlaan in Amsterdam. It consists of a sedimentation pipe with a flow-separating grate, the SediPipe, and a filter-adsorbent, the SediSorp+. It is purported to remove 80 % of TSS by DiBT (the technical authority in the German construction sector) test principles that use Millisil®W4 to simulate real sediments. The full-scale unit was monitored in the city throughout May-September 2022 to assess its performance.
The stormwater runoff discharged from the catchment had high concentrations of lead (54 μg/L) and zinc (790 μg/L), likely due to contact with gutters and old roofing material, amplified by the relative contribution of these roofs to the total catchment discharge (accounting for 50 % of the area contributing to runoff). The sediment (TSS) concentration was low, equivalent to 20 mg/L on average. The sediments were also light and fine—with an organic fraction of 66 % and with 78 % of diameter smaller than 63 μm.
In the SediSubstrator L, the TSS removal efficiency was 34 % on average. This corresponds to an estimated caught load of 2.7 kg for this period. The removal efficiency was shown to increase with an increasing stormwater TSS concentration, with longer antecedent dry periods and with lower TSS organic fractions. Turbidity dynamics in the system suggest that while a net sequestration of solids occurs in the SediPipe, there is a resuspension of fine solids. This was observed in a camera inspection to occur from solids which settle on or near the grate. In an extreme rainfall event on September 28th 2022, water collected on the section of the street connected to the SediSubstrator, the cause of which is still subject to speculation. The observed SediSorp+ filter resistance across the summer was not indicative of gradual clogging, but an inspection showed signs of decayed organic matter throughout the full length of the filter bedas well as traces of cement in two of the four cartridges. It is possible that these two effects together with turbulent inflows prompted the acute clogging behavior.
There is interest in using the SediSubstrator beyond the city of Amsterdam to reduce phosphorus loadings in the road runoff discharged to sensitive nature areas. On the Rooseveltlaan, the average total phosphorus removal efficiency was 18 % (50 % for dissolved, readily bioavailable ortho-phosphate). Interactions with settled sediments generated ortho-phosphate in the SediPipe, and fine particulate and colloidal organic phosphorus was shown remobilized in both the SediPipe and SediSorp+. The removal of ortho-phosphate in theSediSorp+ in natural rainfall was good (on average 50 %) and was shown to be consistent at different contact times (approximately 10-30 minutes).
The installed unit should be monitored over a longer time period of two years for statistical significance and to capture seasonal variation in loads. Nevertheless, the removal efficiency observed on site is consistent with the results of a sedimentation model developed according to Ferguson & Church (2004), using a stormwater sediment particle density as measured at another location in the city. Design adaptations are recommended to improve the SediSubstrator L to the conditions observed in Amsterdam: namely, better site selection, a longer SediPipe section (24 m) and a second filter stage to better capture the fine suspended solids.
Linking cooling by nature and urban drought reduction to irrigation measures
Tackling the urban heat island and droughts simultaneously
Thermal Energy from Surface Waters
The thermal effects and underlying processes during thermal energy extraction from surface waters; a case study in the canals of Amsterdam
Defining the effectiveness of urban runoff measures
A model study
The UWBM has the benefit of using long times series instead of single precipitation events (design storms) as input to determine the effectiveness of measures; antecedent conditions for every extreme event are therefore known. Currently, the UWBM is only determining the runoff volume reduction factor. At the same time, the literature shows the importance of analysing the effectiveness of measures using both flow peak reduction and storage peak reduction. Exploration of the possibility to implement these two reduction factors into the UWBM forms the challenge of this study.
This research aims to define a flow peak- and storage peak reduction factor based on modelling systems in the UWBM using long time series. Because the model describes these factors over the measure area, the second goal of this study is to investigate the possibility of converting this measure factor to a whole project area factor and combining this factor for a combination of measures. Main conclusions of this research are as follows: A flow peak reduction factor can be empirically determined based on the proposed method in this study. A storage peak reduction factor can not be empirically determined based on the proposed method in this study. It is recommended to do more research into the analysis of the storage peaks using time series, since it can give an extra insight into the effectiveness of measures. Converting the found flow peak reduction factor for the measure area to the project area with multiple interventions is substantiated with a proposed equation. However, it is recommended to do more research into the conversion equation to be used in the Adaptation Support Tool. By determining the flow peak reduction factor together with the runoff volume reduction factor, the effectiveness of urban runoff reduction measures in a project area can be quantified and used to compare alternative solutions for their effectiveness in flood risk reduction. The added flow peak reduction factor gives a more thorough insight into this effectiveness of measures.
...
The UWBM has the benefit of using long times series instead of single precipitation events (design storms) as input to determine the effectiveness of measures; antecedent conditions for every extreme event are therefore known. Currently, the UWBM is only determining the runoff volume reduction factor. At the same time, the literature shows the importance of analysing the effectiveness of measures using both flow peak reduction and storage peak reduction. Exploration of the possibility to implement these two reduction factors into the UWBM forms the challenge of this study.
This research aims to define a flow peak- and storage peak reduction factor based on modelling systems in the UWBM using long time series. Because the model describes these factors over the measure area, the second goal of this study is to investigate the possibility of converting this measure factor to a whole project area factor and combining this factor for a combination of measures. Main conclusions of this research are as follows: A flow peak reduction factor can be empirically determined based on the proposed method in this study. A storage peak reduction factor can not be empirically determined based on the proposed method in this study. It is recommended to do more research into the analysis of the storage peaks using time series, since it can give an extra insight into the effectiveness of measures. Converting the found flow peak reduction factor for the measure area to the project area with multiple interventions is substantiated with a proposed equation. However, it is recommended to do more research into the conversion equation to be used in the Adaptation Support Tool. By determining the flow peak reduction factor together with the runoff volume reduction factor, the effectiveness of urban runoff reduction measures in a project area can be quantified and used to compare alternative solutions for their effectiveness in flood risk reduction. The added flow peak reduction factor gives a more thorough insight into this effectiveness of measures.
Determining drought-induced subsidence in urban areas
An in-practice analysis of drought impacts on subsidence in two Dutch soft-soil cities
Grand Bahama after Hurricane Dorian
Interdisciplinary approach to Build Back Better
individual protection. ...
individual protection.
Increasing the resilience of urban areas to extreme precipitation: Are the residents ready?
The receptivity for effective rainproof measures on private terrain in the neighbourhood De Baarsjes, Amsterdam
Sponge Design
A Study on Comprehensive Sponge City Design Approach
The aim of this master thesis was to formulate an improved approach, as well as to improve planning & design framework for supporting integrated sponge design process and enhancing the involvement of various stakeholders. Literature study, the study of current guidelines and sponge plans of Nanjing, and interviews with sponge city practitioners were performed to evaluate current Sponge City (SC) concept and assess SC planning & design practice. Analysis of SC concept development showed that SC has been evolving from a term mainly describing measures with ecological benefits towards a more inclusive urban development paradigm, considering not only water ecology, but also water safety, water environment and water resource. Analysis on SC practice identified the gaps in current SC water management contents, including a lack of design method for calculating storage capacity against pluvial flooding, ignorance of extreme drought assessment, missing groundwater management, etc. Challenges that might impede comprehensive sponge city planning & design process were also enumerated, including data availability and accessibility, the bond between SC and other sector plans, etc.
Based on the identified challenges and gaps, improvements on current planning & design practices were given and a new design approach was proposed, including changing collaboration method, introducing a co-design workshop and using a sponge design toolbox to facilitate planning & design process. The approach provided a method to calculate the required sponge capacity for not only preventing flood damage but also mitigating water shortage in dry spells, as well as quantifying other co-benefits. The improved design approach was tested by a case study in Nanjing, in the Qinhuai District sponge city planning project. Case study results showed that most steps in the proposed design process were successfully taken in Qinhuai project, and the toolbox was able to facilitate planning and design of sponge measures to have functions not only for pluvial flooding prevention and control, but also for water shortage mitigation, ecological benefits and other day-to-day values. The design process also demonstrated the collaborative contribution to a sponge city plan from water managers, water engineers and landscape architects. Therefore, the new design approach can contribute to a more integrated SC planning and design. ...
The aim of this master thesis was to formulate an improved approach, as well as to improve planning & design framework for supporting integrated sponge design process and enhancing the involvement of various stakeholders. Literature study, the study of current guidelines and sponge plans of Nanjing, and interviews with sponge city practitioners were performed to evaluate current Sponge City (SC) concept and assess SC planning & design practice. Analysis of SC concept development showed that SC has been evolving from a term mainly describing measures with ecological benefits towards a more inclusive urban development paradigm, considering not only water ecology, but also water safety, water environment and water resource. Analysis on SC practice identified the gaps in current SC water management contents, including a lack of design method for calculating storage capacity against pluvial flooding, ignorance of extreme drought assessment, missing groundwater management, etc. Challenges that might impede comprehensive sponge city planning & design process were also enumerated, including data availability and accessibility, the bond between SC and other sector plans, etc.
Based on the identified challenges and gaps, improvements on current planning & design practices were given and a new design approach was proposed, including changing collaboration method, introducing a co-design workshop and using a sponge design toolbox to facilitate planning & design process. The approach provided a method to calculate the required sponge capacity for not only preventing flood damage but also mitigating water shortage in dry spells, as well as quantifying other co-benefits. The improved design approach was tested by a case study in Nanjing, in the Qinhuai District sponge city planning project. Case study results showed that most steps in the proposed design process were successfully taken in Qinhuai project, and the toolbox was able to facilitate planning and design of sponge measures to have functions not only for pluvial flooding prevention and control, but also for water shortage mitigation, ecological benefits and other day-to-day values. The design process also demonstrated the collaborative contribution to a sponge city plan from water managers, water engineers and landscape architects. Therefore, the new design approach can contribute to a more integrated SC planning and design.
consequence, people need to rely solely on water tankers which is around 20 times more expensive than the cost of water per kiloliters in urban areas. The case of Sabari Terrace residential apartment complex showed that the adoption of RRWH for water supply contributes to 15% of the annual water demand and it saves up to $6/yr/p. ...
consequence, people need to rely solely on water tankers which is around 20 times more expensive than the cost of water per kiloliters in urban areas. The case of Sabari Terrace residential apartment complex showed that the adoption of RRWH for water supply contributes to 15% of the annual water demand and it saves up to $6/yr/p.
Climate resilience of railway stations in The Netherlands
A risk assessment for passenger stations
Borrowed Land
Reframing the relation between flood and drought adaptation efforts with the built environment in New Orleans
Towards Resilient Urban Stormwater Management in a Tsunami Reconstruction
A Scenario Discovery Study on Ötsuchi Town, Japan
Hydraulic functioning of bioswales under polder conditions
A field-survey in Rotterdam
The effect of polder conditions on the hydraulic performance, as well as the effect of different storm-types and initial conditions will be researched in this report. To this end, 5 bioswales located in Rotterdam, The Netherlands are monitored on their hydraulic behaviour. The discharge of the drain, groundwater levels in and at the edge of the bioswale and the water level in the bioswale are monitored for 4 of the bioswales. One bioswale only has groundwater and surface water measurements. The polder conditions resulted in a low volume reduction and faster and stronger reacting drain. However, the peak reduction and peak delay were still quite good due to the low permeability of the top-soil. For smaller storms, even the goal for volume reduction could be met. It was found that the structural porosity governed the infiltration, but large plants can increase the permeability too much. In addition, the textural porosity should start high enough to allow for vegetation development. ...
The effect of polder conditions on the hydraulic performance, as well as the effect of different storm-types and initial conditions will be researched in this report. To this end, 5 bioswales located in Rotterdam, The Netherlands are monitored on their hydraulic behaviour. The discharge of the drain, groundwater levels in and at the edge of the bioswale and the water level in the bioswale are monitored for 4 of the bioswales. One bioswale only has groundwater and surface water measurements. The polder conditions resulted in a low volume reduction and faster and stronger reacting drain. However, the peak reduction and peak delay were still quite good due to the low permeability of the top-soil. For smaller storms, even the goal for volume reduction could be met. It was found that the structural porosity governed the infiltration, but large plants can increase the permeability too much. In addition, the textural porosity should start high enough to allow for vegetation development.
In this research, the SUPERFLEX conceptual model was adapted to a rural-urban semi-distributed model to simulate the current rainfall-runoff relationship of the catchment where San Antonio city is located in. Besides, the model expressions of 4 representative LID practices (bioretention cells, vegetated swales, green roofs, and permeable pavements) were devised under SUPERFLEX framework. To deal with the prediction uncertainty, three urban development scenarios in 2040 and five LID implementation scenarios were designed for San Antonio city. And their influences on the basin peak runoffs will be quantitively studied.
Research result shows that, the urban runoff tended to swing between extreme flood and extreme drought in the reference situation; And next, the infill urban development strategy, which means developing the vacant or undeveloped land within an existing community, was more helpful on peak runoff and total runoff volume control than sprawl urban development strategy with the same population growth; Thirdly, the bioretention cells, vegetated swales, and permeable pavements had similar good performance on peak runoff reduction, which can be mainly ascribe to the stormwater infiltration process. As for the retention of total runoff volume, the bioretention cells, permeable pavements, and green roofs perform better than vegetated swales since the rapid water transportation character of vegetated swales decrease the water residence time for infiltration;
The runoff reduction function of LID practices performs effective on the large peaks in dry and normal seasons, but it will be restrained significantly in flood season. According to model result, the rural peak runoffs happened 6.5 to 15.5 hours after the urban peaks. And for 4 LID implementation scenarios in which 15% of urban grey areas is covered by LID practices, the urban peaks are delayed between 0.5 and 2.5 hours. And for the scenario with the LID cover areas as 50% of the urban grey areas, the time lag of urban peaks varies from 0.5 to 6.5 hours. For this scenario, since the obvious time delay of urban peaks, more stack of urban and rural peaks is caused by the time approaching of urban and rural peaks, which causes the increases of two total basin peaks in flood season from 3.57 to 3.65 mm/d and from 6.35 to 6.47 mm/d respectively.
In conclusion we may say that the stacking effect of LID implementation on total basin runoff is limited in the case of San Antonio basin, partly due to the fact that only a small part of this basin is urbanized.
...
In this research, the SUPERFLEX conceptual model was adapted to a rural-urban semi-distributed model to simulate the current rainfall-runoff relationship of the catchment where San Antonio city is located in. Besides, the model expressions of 4 representative LID practices (bioretention cells, vegetated swales, green roofs, and permeable pavements) were devised under SUPERFLEX framework. To deal with the prediction uncertainty, three urban development scenarios in 2040 and five LID implementation scenarios were designed for San Antonio city. And their influences on the basin peak runoffs will be quantitively studied.
Research result shows that, the urban runoff tended to swing between extreme flood and extreme drought in the reference situation; And next, the infill urban development strategy, which means developing the vacant or undeveloped land within an existing community, was more helpful on peak runoff and total runoff volume control than sprawl urban development strategy with the same population growth; Thirdly, the bioretention cells, vegetated swales, and permeable pavements had similar good performance on peak runoff reduction, which can be mainly ascribe to the stormwater infiltration process. As for the retention of total runoff volume, the bioretention cells, permeable pavements, and green roofs perform better than vegetated swales since the rapid water transportation character of vegetated swales decrease the water residence time for infiltration;
The runoff reduction function of LID practices performs effective on the large peaks in dry and normal seasons, but it will be restrained significantly in flood season. According to model result, the rural peak runoffs happened 6.5 to 15.5 hours after the urban peaks. And for 4 LID implementation scenarios in which 15% of urban grey areas is covered by LID practices, the urban peaks are delayed between 0.5 and 2.5 hours. And for the scenario with the LID cover areas as 50% of the urban grey areas, the time lag of urban peaks varies from 0.5 to 6.5 hours. For this scenario, since the obvious time delay of urban peaks, more stack of urban and rural peaks is caused by the time approaching of urban and rural peaks, which causes the increases of two total basin peaks in flood season from 3.57 to 3.65 mm/d and from 6.35 to 6.47 mm/d respectively.
In conclusion we may say that the stacking effect of LID implementation on total basin runoff is limited in the case of San Antonio basin, partly due to the fact that only a small part of this basin is urbanized.
Assessing and modeling the hydrological performance of DIT sewers
A case study at Kuiperstraat and H.A.J.M. Schaepmanstraat, Gouda, Netherlands
Analysing the effects of extreme precipitation for municipalities and waterboards
Do they need to connect their sewer and surface water models?