Daniel Hall
Please Note
16 records found
1
Navigating investment dynamics
Strategic corporate venture capital investment decision-making in ConTech impact startups
This study addresses that gap by examining how strategic CVCs govern strategic fit when investing in ConTech impact startups. An abductive single case study is conducted of TBI Zebra, a steward-owned strategic CVC operating within TBI Holdings, one of the Netherlands' largest construction groups. Data were collected through nine semi-structured interviews spanning governance, legal, sustainability, and subsidiary levels, supplemented by three startup conversations and external validation interviews with CVC professionals active in the broader European CVC landscape. The central finding is a structural paradox: strategic fit is unanimously identified as the primary investment criterion and the main governance mechanism that distinguishes CVCs from other VC types, yet it simultaneously remains the most informally defined and internally contested element of the investment process. Structural tensions between holding-level strategic intent and subsidiary-level enactment further constrain the sustained operationalisation of this alignment. These findings contribute a theoretically grounded, process-level account of mission-driven CVC governance in capital-intensive sectors, and deliver a practical ...
This study addresses that gap by examining how strategic CVCs govern strategic fit when investing in ConTech impact startups. An abductive single case study is conducted of TBI Zebra, a steward-owned strategic CVC operating within TBI Holdings, one of the Netherlands' largest construction groups. Data were collected through nine semi-structured interviews spanning governance, legal, sustainability, and subsidiary levels, supplemented by three startup conversations and external validation interviews with CVC professionals active in the broader European CVC landscape. The central finding is a structural paradox: strategic fit is unanimously identified as the primary investment criterion and the main governance mechanism that distinguishes CVCs from other VC types, yet it simultaneously remains the most informally defined and internally contested element of the investment process. Structural tensions between holding-level strategic intent and subsidiary-level enactment further constrain the sustained operationalisation of this alignment. These findings contribute a theoretically grounded, process-level account of mission-driven CVC governance in capital-intensive sectors, and deliver a practical
Managing Mass Timber
Points of Awareness in Non-residential Construction Projects in the Netherlands
Mass timber is a promising alternative to conventional concrete and steel construction because of its potential to reduce greenhouse gas emissions and to be prefabricated, which can shorten construction time. Despite these advantages, mass timber has not yet been widely adopted in the Netherlands, particularly in non-residential projects. Existing academic literature mainly focuses on technical and environmental performance and is largely internationally oriented, leaving a gap in organisational aspects within the Dutch context.
This research addresses the question: What points of awareness are essential for project managers during the initiation, design, and construction phases of non-residential mass timber projects in the Netherlands?
Based on the Project Design Cycle theory of Heintz et al. (2016), project management is viewed as a cyclical process of awareness, design, performance, and reflection. Due to the recent emergence of mass timber, heightened awareness is required throughout the project lifecycle, revealing a focus on this aspect of project management.
A mixed-method approach was applied. First, a literature study is conducted, resulting in the development of a theoretical process map. This was followed by a comparative case study of four Dutch non-residential mass timber projects supported by semi-structured interviews, resulting in a process map adapted to the Dutch context. Finally, a focus group with project managers validated and expanded the findings, resulting in a validated process map.
The findings highlight that in the initiation phase, the key awareness point is mass timber adoption, where material selection is driven by sustainability, circularity, aesthetics, and strategic considerations rather than prescription. Awareness of higher costs, schedule implications, and delivery method selection is also essential in this phase. In the design phase, the most important factor is assembling an experienced, integrated multidisciplinary team. Additional considerations include fire safety, acoustics, installations, permitting, and BIM agreements. In the construction phase, moisture management and logistics are most critical, while precision and early coordination are necessary to realise efficiency gains.
The findings demonstrate that successful non-residential mass timber projects in the Netherlands depend on continuous awareness of both material-specific and organisational factors, supported by experienced teams and coordinated decision-making across all project phases.
Reuse Possibilities within (De-)Construction in The Netherlands
Multi-Methods Material Flow Analysis
This thesis contributes to the urban mining field by investigating: “To what extent can material reuse meet the demand by synchronising material flows in the built environment of The Netherlands from 2018 to 2023?”. It aims to answer this by using a mixed-methods approach. By combining quantitative methods (spatial modelling using GIS and Material Flow Analysis) and qualitative methods (stakeholder interviews), this thesis develops a framework for analysing the reuse potential of material outflows from demolition combined with construction inflows.
It quantifies and spatialises material stocks, inflows, and outflows across national, provincial and municipal scale in the Netherlands through a bottom-up-approach. Furthermore, it analyses a specific Reuse scenario for bricks, comparing it with Recycling and Business-as-Usual scenarios. It combines historical GIS data (BAG 2018–2023), using the new Multi-Temporal Building Stock Analysis, to identify demolished and newly built structures. Furthermore, interviews were held with three demolition companies and one architectural firm. Insights into current reuse practices fed back into the analysis of the material flows and enabled a quantified national Reuse scenario for bricks.
The results show that bricks exhibit substantial reuse potential: under the Reuse scenario, an estimated 26% of the brick demand could be met with reclaimed bricks, leading to about 58% CO₂-eq. reduction compared to the Business-as-Usual scenario. Although data limitations prevented similar quantification for steel and concrete, qualitative findings suggest that heavy structural components could be reused effectively between similar building types. Demolition companies’ views on reuse potential of components vary per reuse chain, with those involved in construction projects more successfully reusing larger steel and concrete components. Significant reuse potential seems to exist for industrial and office buildings, especially for steel and concrete, based on flow ratios and interview insights. Office buildings in particular show strong potential in substituting demand through reuse, as material supply and demand are nearly balanced. Cross-regional exchange could further align supply and demand, which vary by region. In contrast, residential buildings show lower potential in substituting material demand through reuse due to lower outflow-to-inflow ratios and fewer reuse initiatives.
Furthermore, this thesis emphasizes the need to shift analytical focus from materials to components recognizing their diversity, condition, and physicality. ...
This thesis contributes to the urban mining field by investigating: “To what extent can material reuse meet the demand by synchronising material flows in the built environment of The Netherlands from 2018 to 2023?”. It aims to answer this by using a mixed-methods approach. By combining quantitative methods (spatial modelling using GIS and Material Flow Analysis) and qualitative methods (stakeholder interviews), this thesis develops a framework for analysing the reuse potential of material outflows from demolition combined with construction inflows.
It quantifies and spatialises material stocks, inflows, and outflows across national, provincial and municipal scale in the Netherlands through a bottom-up-approach. Furthermore, it analyses a specific Reuse scenario for bricks, comparing it with Recycling and Business-as-Usual scenarios. It combines historical GIS data (BAG 2018–2023), using the new Multi-Temporal Building Stock Analysis, to identify demolished and newly built structures. Furthermore, interviews were held with three demolition companies and one architectural firm. Insights into current reuse practices fed back into the analysis of the material flows and enabled a quantified national Reuse scenario for bricks.
The results show that bricks exhibit substantial reuse potential: under the Reuse scenario, an estimated 26% of the brick demand could be met with reclaimed bricks, leading to about 58% CO₂-eq. reduction compared to the Business-as-Usual scenario. Although data limitations prevented similar quantification for steel and concrete, qualitative findings suggest that heavy structural components could be reused effectively between similar building types. Demolition companies’ views on reuse potential of components vary per reuse chain, with those involved in construction projects more successfully reusing larger steel and concrete components. Significant reuse potential seems to exist for industrial and office buildings, especially for steel and concrete, based on flow ratios and interview insights. Office buildings in particular show strong potential in substituting demand through reuse, as material supply and demand are nearly balanced. Cross-regional exchange could further align supply and demand, which vary by region. In contrast, residential buildings show lower potential in substituting material demand through reuse due to lower outflow-to-inflow ratios and fewer reuse initiatives.
Furthermore, this thesis emphasizes the need to shift analytical focus from materials to components recognizing their diversity, condition, and physicality.
The objective of this research is to develop and evaluate a structured MP workflow applicable to new buildings from early design to manufacturing phases (RIBA Stages 1–5). A Design Science Research method was used across two iterations. In the first, literature reviews and expert interviews identified workflow objectives and stakeholder responsibilities, resulting in an initial workflow. The second iteration involved improving the workflow and testing it through a template-based data collection exercise within the Stanford AEC Global Teamwork course, where feedback was gathered from multidisciplinary participants.
Best practices observed include workflow clarity, ease of use, alignment with existing carbon accounting practices, and stakeholder agreement on responsibilities. Key challenges include difficulty in disassembly data interpretation, time-consuming manual data extraction, and hesitance from subcontractors accustomed to conventional practices. The workflow currently lacks automation and has limited real-world validation.
The scope focuses on component-level MPs, omits product-level inputs, and is limited to academic testing within a European policy framework. The full lifecycle impact of MPs remains theoretical, and applicability may be limited in regions without supportive reuse markets or regulatory incentives. Despite these limitations, the proposed workflow lays a foundation for future real-world MP adoption and suggests areas for expansion, including AI-assisted data extraction and integration across all lifecycle stages.
...
The objective of this research is to develop and evaluate a structured MP workflow applicable to new buildings from early design to manufacturing phases (RIBA Stages 1–5). A Design Science Research method was used across two iterations. In the first, literature reviews and expert interviews identified workflow objectives and stakeholder responsibilities, resulting in an initial workflow. The second iteration involved improving the workflow and testing it through a template-based data collection exercise within the Stanford AEC Global Teamwork course, where feedback was gathered from multidisciplinary participants.
Best practices observed include workflow clarity, ease of use, alignment with existing carbon accounting practices, and stakeholder agreement on responsibilities. Key challenges include difficulty in disassembly data interpretation, time-consuming manual data extraction, and hesitance from subcontractors accustomed to conventional practices. The workflow currently lacks automation and has limited real-world validation.
The scope focuses on component-level MPs, omits product-level inputs, and is limited to academic testing within a European policy framework. The full lifecycle impact of MPs remains theoretical, and applicability may be limited in regions without supportive reuse markets or regulatory incentives. Despite these limitations, the proposed workflow lays a foundation for future real-world MP adoption and suggests areas for expansion, including AI-assisted data extraction and integration across all lifecycle stages.
Adopting Digital Green Bonds
Benefits, Barriers, and Solutions
Are you familiar with our concept?
Understanding how Bouwstromen shape collaboration and conceptual housing delivery in the Netherlands
From One-Offs to Roll-Outs
Navigating Organizational Tensions in Product Platform Development towards Industrialized Construction
This study begins with a theoretical background to establish a foundation for understanding the case later on, using academic papers sourced from Google Scholar. The empirical research adopts qualitative methods, focusing on a single-case study of VORM 2050. Semi-structured interviews guided by abductive reasoning align empirical observations with theoretical insights. Organizational ethnography is employed as a secondary method, involving observations of daily practices, meetings, and project documentation. Finally, recommendations will be developed using workshops with VORM 2050 to collectively reflect on tensions and identify improvements to organizational practices.
The primary goal of this study is to support the transition of construction companies towards industrialized practices. This includes a case study of VORM 2050’s ongoing transition, focusing on organizational practices and enhancing understanding through theoretical frameworks. The key outcome is a set of practice-informed recommendations, offering actionable guidance for integrating platform thinking and improving organizational routines. These insights address the lack of managerial perspective on navigating tensions during platform transitions and are applicable to other construction companies. The findings will be shared with VORM 2050 and broader stakeholders, ensuring privacy while making the outcomes available through the TU Delft repository. ...
This study begins with a theoretical background to establish a foundation for understanding the case later on, using academic papers sourced from Google Scholar. The empirical research adopts qualitative methods, focusing on a single-case study of VORM 2050. Semi-structured interviews guided by abductive reasoning align empirical observations with theoretical insights. Organizational ethnography is employed as a secondary method, involving observations of daily practices, meetings, and project documentation. Finally, recommendations will be developed using workshops with VORM 2050 to collectively reflect on tensions and identify improvements to organizational practices.
The primary goal of this study is to support the transition of construction companies towards industrialized practices. This includes a case study of VORM 2050’s ongoing transition, focusing on organizational practices and enhancing understanding through theoretical frameworks. The key outcome is a set of practice-informed recommendations, offering actionable guidance for integrating platform thinking and improving organizational routines. These insights address the lack of managerial perspective on navigating tensions during platform transitions and are applicable to other construction companies. The findings will be shared with VORM 2050 and broader stakeholders, ensuring privacy while making the outcomes available through the TU Delft repository.
This thesis explores how the adoption of these unified standards can be promoted to accelerate the IFD transition. An abductive, exploratory, qualitative design was used, combining theory and empirics through systematic combining. The research included a multiple-case study of three IFD bridge projects and 14 semi-structured interviews with supply-chain actors. A custom evaluation matrix assessed each case’s industrialisation, flexibility, demountability, and NTA conformity.
Findings show that IFD and NTA implementation is advancing but uneven. Industrialisation remains limited to prefabrication, flexibility is underdeveloped, and demountability is relatively mature. Collaborative procurement frameworks enable learning and innovation, whereas traditional D&C contracts can constrain progress. Furthermore, interviews revealed seven key barriers (e.g. NTA-specific limitations and lack of coordinated leadership) and three interventions themes (e.g. communication and regulatory instruments).
In conclusion, effective NTA adoption relies on coordinated client leadership with a phased mix of systemic interventions. Building awareness competence and partnering through communication-oriented interventions can help NTA adoption. Also, institutionalising and aligning regulatory instruments by continuous refinement and gradual formalisation of the NTAs within procurement frameworks can enhance consistency. Moreover, economic incentives can improve financial feasibility. Ultimately, governance alignment and sustained public-sector leadership are essential to transform isolated pilots into a unified, platform-based IFD bridge supply chain, enabling large-scale, circular bridge renewal aligned with the V&R challenge and sustainability objectives.
...
This thesis explores how the adoption of these unified standards can be promoted to accelerate the IFD transition. An abductive, exploratory, qualitative design was used, combining theory and empirics through systematic combining. The research included a multiple-case study of three IFD bridge projects and 14 semi-structured interviews with supply-chain actors. A custom evaluation matrix assessed each case’s industrialisation, flexibility, demountability, and NTA conformity.
Findings show that IFD and NTA implementation is advancing but uneven. Industrialisation remains limited to prefabrication, flexibility is underdeveloped, and demountability is relatively mature. Collaborative procurement frameworks enable learning and innovation, whereas traditional D&C contracts can constrain progress. Furthermore, interviews revealed seven key barriers (e.g. NTA-specific limitations and lack of coordinated leadership) and three interventions themes (e.g. communication and regulatory instruments).
In conclusion, effective NTA adoption relies on coordinated client leadership with a phased mix of systemic interventions. Building awareness competence and partnering through communication-oriented interventions can help NTA adoption. Also, institutionalising and aligning regulatory instruments by continuous refinement and gradual formalisation of the NTAs within procurement frameworks can enhance consistency. Moreover, economic incentives can improve financial feasibility. Ultimately, governance alignment and sustained public-sector leadership are essential to transform isolated pilots into a unified, platform-based IFD bridge supply chain, enabling large-scale, circular bridge renewal aligned with the V&R challenge and sustainability objectives.
The findings reveal that different orchestration mechanisms—standardisation, nurturing, negotiation, and ownership—are emphasised depending on the company’s role within the ecosystem. Keystone companies prioritise standardisation and nurturing, while niche players focus on negotiation and ownership to protect their contributions. Additionally, the study highlights how the companies’ business models, company size, and market targets influence their approach to platform development. Cross-case analysis also revealed that effective management of ecosystem boundaries and regional regulations plays a critical role in product platform success.
In conclusion, industrialised construction companies can enhance ecosystem collaboration in product platform development by strategically balancing orchestration mechanisms and aligning ecosystem partners around shared goals, which are based on the company’s role.
...
The findings reveal that different orchestration mechanisms—standardisation, nurturing, negotiation, and ownership—are emphasised depending on the company’s role within the ecosystem. Keystone companies prioritise standardisation and nurturing, while niche players focus on negotiation and ownership to protect their contributions. Additionally, the study highlights how the companies’ business models, company size, and market targets influence their approach to platform development. Cross-case analysis also revealed that effective management of ecosystem boundaries and regional regulations plays a critical role in product platform success.
In conclusion, industrialised construction companies can enhance ecosystem collaboration in product platform development by strategically balancing orchestration mechanisms and aligning ecosystem partners around shared goals, which are based on the company’s role.
This research explores how lean tools can improve RM in the construction industry to enhance the ability of construction organizations to anticipate, mitigate, and respond to risks. It does so by analyzing the RM process to identify gaps and deficiencies in existing knowledge and practices. It then examines the nature and potential of lean tools to address these deficiencies.
The aim of this research is to understand the common issues in construction RM and highlight the potential for integrating lean tools into the RM process to achieve more resilient and efficient operations in the construction sector.
The result of the research is a conceptual lean RM framework, developed based on issues identified in the literature and supported by practical evidence, along with an analysis of lean construction tools and their potential to address chosen RM challenges. The framework spans the tender, planning, development, and construction phases. In addition to the framework, the approach to its application is outlined, including potential short-term and long-term benefits, inherent limitations, and potential integration challenges. The framework’s potential application environment is conceptually explored, and recommendations are offered for construction companies, standard developers, prospective users of the framework and future research efforts. ...
This research explores how lean tools can improve RM in the construction industry to enhance the ability of construction organizations to anticipate, mitigate, and respond to risks. It does so by analyzing the RM process to identify gaps and deficiencies in existing knowledge and practices. It then examines the nature and potential of lean tools to address these deficiencies.
The aim of this research is to understand the common issues in construction RM and highlight the potential for integrating lean tools into the RM process to achieve more resilient and efficient operations in the construction sector.
The result of the research is a conceptual lean RM framework, developed based on issues identified in the literature and supported by practical evidence, along with an analysis of lean construction tools and their potential to address chosen RM challenges. The framework spans the tender, planning, development, and construction phases. In addition to the framework, the approach to its application is outlined, including potential short-term and long-term benefits, inherent limitations, and potential integration challenges. The framework’s potential application environment is conceptually explored, and recommendations are offered for construction companies, standard developers, prospective users of the framework and future research efforts.
hierarchical structures, is undergoing a transformation driven by technological advancements.
Despite these innovations, many global companies in the industry have retained their
conventional organizational and governance frameworks. This study investigates the potential of Decentralized Autonomous Organizations (DAOs) to introduce a bottom-up management approach in the ACE industry, focusing on their transformative impact on architectural design methodologies.
The research addresses a significant gap in the literature regarding the management and
governance frameworks necessary for effective collaboration and distributed architectural
design within DAOs. The study employs an extended single case study methodology, utilizing
semi-structured interviews, ethnographic observations on Discord and Telegram, and a
comprehensive literature review. The case study centers on ArchiDAO, the first architect-founded DAO, and its participation in the Evolo Skyscraper Design Competition 2024.
ArchiDAO's innovative vision and task-based model are examined to understand how DAOs
can manage collective and distributed architectural projects. Key findings reveal that DAOs
can enhance project management through transparent and decentralized decision-making
processes, equitable reward systems, and advanced communication tools. However,
challenges such as role ambiguity, inconsistent task completion, and limited blockchain
utilization were also identified.
This study's outcomes highlight the effectiveness of DAOs in promoting decentralized
leadership and collaboration, reflecting practices observed in young architectural collectives.
These collectives, often formed in response to traditional top-down approaches, emphasize
multidisciplinary and non-hierarchical structures that align with the principles of DAOs. The
research contributes to the adaptability of architecture firms in the evolving AEC industry by
providing insights into the integration of decentralized models for more effective and
inclusive project management. ...
hierarchical structures, is undergoing a transformation driven by technological advancements.
Despite these innovations, many global companies in the industry have retained their
conventional organizational and governance frameworks. This study investigates the potential of Decentralized Autonomous Organizations (DAOs) to introduce a bottom-up management approach in the ACE industry, focusing on their transformative impact on architectural design methodologies.
The research addresses a significant gap in the literature regarding the management and
governance frameworks necessary for effective collaboration and distributed architectural
design within DAOs. The study employs an extended single case study methodology, utilizing
semi-structured interviews, ethnographic observations on Discord and Telegram, and a
comprehensive literature review. The case study centers on ArchiDAO, the first architect-founded DAO, and its participation in the Evolo Skyscraper Design Competition 2024.
ArchiDAO's innovative vision and task-based model are examined to understand how DAOs
can manage collective and distributed architectural projects. Key findings reveal that DAOs
can enhance project management through transparent and decentralized decision-making
processes, equitable reward systems, and advanced communication tools. However,
challenges such as role ambiguity, inconsistent task completion, and limited blockchain
utilization were also identified.
This study's outcomes highlight the effectiveness of DAOs in promoting decentralized
leadership and collaboration, reflecting practices observed in young architectural collectives.
These collectives, often formed in response to traditional top-down approaches, emphasize
multidisciplinary and non-hierarchical structures that align with the principles of DAOs. The
research contributes to the adaptability of architecture firms in the evolving AEC industry by
providing insights into the integration of decentralized models for more effective and
inclusive project management.
Integrating blockchain-based Material Passports (BBMPs) into practice for a circular built environment
A closer look at opportunities and barriers
Circular Industrialised Construction
Strategies for the operations and end-of-life phases
This research examines the strategies three case companies apply for their standardised modular buildings' operation and end-of-life phases. The research is carried out by conducting interviews with employees of the three case companies. The initial selection of case companies, CitizenM, Daiwa Modular Europe, and Home.Earth, is based on their utilisation of industrialised building methods and their assertions regarding circularity. Additionally, the companies are selected by a few diversifying characteristics, such as whether they are owner/developer, the type of real estate they develop, and the type of components they manufacture (volumetric or planar). After the initial within-case analysis, a cross-case analysis is carried out.
The case studies demonstrate that there exist many differentiating approaches to the operation and end-of-life phases of Circular Industrialised Construction buildings. A reason for these varying methods is on which building layers significant efforts are made to circularise the buildings. An important enabler of circularising the operation and end-of-life phase is to appropriate the design phase and extensively collaborate in or with the manufacturing phase. Additionally, some pitfalls are identified for the application of Circular Industrialised Construction.
Based on the initial results, a Circular Industrialised Construction framework is being proposed. The framework combines the different Shearing Layers Concept and the different phases associated with Industrialised Construction and design. The framework categorises the identified strategies in the different phases based on the Shearing Layer Concept. The aim is to provide a directory that allows companies to incrementally implement circularity efforts or adopt an Industrialised Construction approach.
...
This research examines the strategies three case companies apply for their standardised modular buildings' operation and end-of-life phases. The research is carried out by conducting interviews with employees of the three case companies. The initial selection of case companies, CitizenM, Daiwa Modular Europe, and Home.Earth, is based on their utilisation of industrialised building methods and their assertions regarding circularity. Additionally, the companies are selected by a few diversifying characteristics, such as whether they are owner/developer, the type of real estate they develop, and the type of components they manufacture (volumetric or planar). After the initial within-case analysis, a cross-case analysis is carried out.
The case studies demonstrate that there exist many differentiating approaches to the operation and end-of-life phases of Circular Industrialised Construction buildings. A reason for these varying methods is on which building layers significant efforts are made to circularise the buildings. An important enabler of circularising the operation and end-of-life phase is to appropriate the design phase and extensively collaborate in or with the manufacturing phase. Additionally, some pitfalls are identified for the application of Circular Industrialised Construction.
Based on the initial results, a Circular Industrialised Construction framework is being proposed. The framework combines the different Shearing Layers Concept and the different phases associated with Industrialised Construction and design. The framework categorises the identified strategies in the different phases based on the Shearing Layer Concept. The aim is to provide a directory that allows companies to incrementally implement circularity efforts or adopt an Industrialised Construction approach.
The objective of this study is to propose a framework that could help improve the risk management project by offering a more proactive approach and at the same time enhance people’s engagement with risks. The goal of this thesis project is to support construction companies in approaching risk management in a way that incorporates agile methods.
Implemented in a project and evaluated through questionnaires and a focus group, the framework showed promise in elevating risk awareness and fostering interdisciplinary collaboration. However, incomplete implementation of some elements limited definitive effectiveness assessments. Subsequent expert judgment sessions confirmed the framework's potential in proactive risk identification and management, alongside the initial findings of heightened awareness and collaboration. Recommendations for improvement include clearer risk impact depiction and explicit framework objectives communication. Essential for success are targeted risk training, clear vision articulation, and structured step-by-step implementation supported by project managers and risk coordinators.
In summary, the proposed framework merges agile principles with risk management, aiming to cultivate a proactive risk culture, enhance team communication, and mitigate increase engagement with risks. While showing significant benefits, it also highlights the need for adjustments to fully realize its effectiveness in the construction industry's risk management practices. This study underscores the importance of agile methodologies in enhancing traditional risk management approaches, offering insights for future application and refinement. ...
The objective of this study is to propose a framework that could help improve the risk management project by offering a more proactive approach and at the same time enhance people’s engagement with risks. The goal of this thesis project is to support construction companies in approaching risk management in a way that incorporates agile methods.
Implemented in a project and evaluated through questionnaires and a focus group, the framework showed promise in elevating risk awareness and fostering interdisciplinary collaboration. However, incomplete implementation of some elements limited definitive effectiveness assessments. Subsequent expert judgment sessions confirmed the framework's potential in proactive risk identification and management, alongside the initial findings of heightened awareness and collaboration. Recommendations for improvement include clearer risk impact depiction and explicit framework objectives communication. Essential for success are targeted risk training, clear vision articulation, and structured step-by-step implementation supported by project managers and risk coordinators.
In summary, the proposed framework merges agile principles with risk management, aiming to cultivate a proactive risk culture, enhance team communication, and mitigate increase engagement with risks. While showing significant benefits, it also highlights the need for adjustments to fully realize its effectiveness in the construction industry's risk management practices. This study underscores the importance of agile methodologies in enhancing traditional risk management approaches, offering insights for future application and refinement.
The urban dormitory
Reducing the negative consequences of studentification in small-sized university cities
The case studies show that the integration of bio-based material is even more difficult in modular construction. It shows that the adoption revolves around wood products due to their proven quality and reliable supply. While acknowledging the potential and benefits of bio-based materials, construction companies perceive material replacement not as the most cost-effective option, making the adoption of bio-based materials to the existing system a formidable task. Additionally, the study also underlines the insufficiency of bio-based materials' performance and capacity to fulfill larger-scale modular building production.
Strategic pathways for IC companies encompass supply chain integration to scale up production capacity and joint R&D to speed up product development. Together with the regulatory bodies, companies can increase engagement in bio-based construction to attract more players and develop clear regulations to mitigate the potential misuse of IC applications. ...
The case studies show that the integration of bio-based material is even more difficult in modular construction. It shows that the adoption revolves around wood products due to their proven quality and reliable supply. While acknowledging the potential and benefits of bio-based materials, construction companies perceive material replacement not as the most cost-effective option, making the adoption of bio-based materials to the existing system a formidable task. Additionally, the study also underlines the insufficiency of bio-based materials' performance and capacity to fulfill larger-scale modular building production.
Strategic pathways for IC companies encompass supply chain integration to scale up production capacity and joint R&D to speed up product development. Together with the regulatory bodies, companies can increase engagement in bio-based construction to attract more players and develop clear regulations to mitigate the potential misuse of IC applications.