In the early project phase, decisions are made when considering a port basin berth layout that affects the outcome and the success of the project. In order to make a decision regarding the berth layout, port planners create a set of variants for comparison and assessment in order ...
In response to Amsterdam’s housing shortage, IJburg on the east side of Amsterdam, is being devel- oped. IJburg consists of six artificial islands in total on which about 20,000 homes for 50,000 residents are being built. Strandeiland (Beach island in English), located in the lak ...

Potential Hydrogen Export Port in Río Negro

A Multi-Criteria Analysis on the Optimal Location for a Potential Hydrogen Export Port in the Province of Río Negro, Argentina

Over the last years, the urge to reduce the world’s air pollutants is rapidly growing. New possibilities in order to replace fossil fuels have been explored and one of them is the usage of green hydrogen. The Argentinian, North Patagonian, province of Río Negro, has a great poten ...
Container traffic worldwide has shown a growing trend during the last years. Also, the number of containers handled per call has increased for many terminals. This poses challenges to existing terminals for more efficient operations and higher productivity. Automation is a way so ...
Sediment management is necessary to keep the Waal navigable. Sediment management in the Waal is carried out by both dredging and plowing of the river bed. By analysing historic data available at Rijkswaterstaat, the relation between the hydrograph and the amount of required dredg ...
Recently, pressure on port authorities to improve port efficiency is increasing due to port competitiveness. Multiple activities within a port influence the efficiency of a port. In this research, the processes of the 'nautical chain' are considered. The nautical chain consists o ...

A Tool for Container Terminal Design

Developing a tool for container terminal design on a concept design phase while taking into account area limitations

Due to the increase of global containerized trade and container vessel sizes, the necessity of container terminal development is unavoidable. On the other hand, designing a container terminal is a very complex process, and on a concept design phase, a quick assessment for the des ...
The inland waterways are an important part of the freight transport system of the Netherlands. In the coming years, a lot of maintenance and construction works are needed to keep the network operational. This can temporarily impact the availability of the waterways section which ...
Indonesia is one of the largest ocean pollutants in the world in terms of plastic emissions. The country has many tourist areas, including the island of Bali, which is the main tourist hub. The plastic problem is large around and on Bali, which has negative consequences for both ...
The current social climate in which sustainable awareness is prioritized, is affecting the port sector. In new-to-develop ports and in the expansion and maintenance of existing ports, implementing sustainability is  encouraged.However, applying sustainability is not self-evident. ...
The increase of ship traffic flow, densities, ship size, and the uncertainty from technological advancement raise issues in traffic safety and efficiency. In order to tackle the issue, currently, a simulation model is widely used by various users as the port authority and bridge ...
In spite of the major and broad consequences of adverse climate change impacts on ports in general, relatively little and relevant detailed research is made available within public domain. Several studies have addressed climate impacts on transportation infrastructure however ver ...
To continue the success of the Port of Rotterdam (PoR) in the future, a transition to a sustainable industry is essential. Though this is easier said than done. The energy transition involves a variety of initiatives which are at the same time highly dependent on each other. Whil ...
The initial masterplan of New Priok Development in Indonesia was developed in 2012 and is being updated to cater to new throughput demands. The masterplan of Phase I will be done as planned in which CT 1 was already operated since 2016 and CT 2 and CT 3 are in the final phase of ...
Ports worldwide are confronted with a changing environment in terms of global economy and a rising awareness of the necessity of balancing economic, social and environmental interests. Therefore, in recent years, a lot of research has been directed towards studying sustainable po ...