Circular Image

J.S. Hoving

34 records found

Multi-vessel Optimisation Framework for Offshore Wind Farm Substructure Installation

Integrating Foundation Type Selection, Alternative Transport Vessels, and Weather Uncertainty

The ever-increasing size of offshore wind turbines, combined with the development of wind farms at more remote sites with deeper waters and more extreme weather conditions, presents significant logistical challenges. Furthermore, the offshore wind sector face ...

Exploring the potential application of Machine Learning on NEN 2767 Bridge Data

An assessment of the Netherlands' readiness for implementing machine learning on bridge condition data maintained by Dutch government bodies

The Netherlands faces a significant challenge in maintaining its estimated 85,000 bridges, most of which were constructed between the 1950s and 1970s. Addressing this "Replacement and Repair Challenge" requires prioritizing bridges at high risk of deterioration to optimize mainte ...
This research addresses the challenges of installing floating wind turbines on semi-submersible platforms, with a focus on managing relative motions during offshore integration. Traditional methods, which rely on large onshore marshaling yards, are constrained by the limited spac ...

Investigation of Response Amplification and Dynamic Stability of a Hyperloop System

Analysing the Interaction of the Vehicle with a Tubular Shell

Hyperloop is a high-speed transportation mode that operates through magnetic levitation of so-called pods which are then transported through a tunnel in which a low-pressure environment is created. Due to reduced air resistance and friction, high velocities are achievable. This t ...
This thesis is a about a novel float-over concept for the installation of offshore substations in the Dutch North Sea. This new technology is a topside jacking system integrated into the H-851 float-over barge which should be able to jack the topside to a higher elevation before ...
The projected rise in monopile installations for offshore wind turbines has spurred interest in innovative installation methods to install larger monopiles using floating vessels while simultaneously enhancing workability and efficiency. One such innovation is the motion-compensa ...
The field of wind energy has experienced significant expansion and development driven by the need to reduce reliance on fossil fuels. Offshore wind turbines have become increasingly popular leading to larger turbines with greater energy output to match the growing demand. The mos ...

Helical Piles as Complementary Foundation for Offshore Temporary Structures

A study into the effects of incorporating helical piles into monopile installation templates

This study examines the effect of adding helical piles to the foundation mechanism of monopile installation templates. A monopile installation template is a gravity-based structure, which is placed on the seabed. The installation template is utilised for the installation of monop ...

Wave Induced Dynamics of Offshore Heavy Lift Cranes on Jack-Ups

Analysis of the annual probability of failure of the crane in normal operation

Due to the increasing size of offshore wind turbines, the jack-up vessels and cranes installing them need to increase in size. The increase in length of the crane boom results in an increase of the dynamic response of the crane. This increase in response results in higher loads i ...
Suction caisson jacket (SCJ) is one of the most promising substructures, under certain conditions, for offshore wind turbines. Their unique characteristic of large diameter (D) compared to their small wall thickness (t) conducts them an object of study, concerning their transport ...
The current research stems from the motivation of controlling the phenomenon of traffic congestion in urban areas that can be deteriorated due to the implementation of a construction project. Nowadays, it is frequently observed that construction activities in complex urban enviro ...
This paper investigates the technical, life cycle, and economic feasibility of a 30 MW upscaled downwind turbine, comparing it to a 15 MW X1 Wind PivotBuoy downwind turbine and a benchmark 15 MW IEA Umaine VolturnUS-S upwind turbine in the 450 MW Sud de la Bretagne I wind farm si ...

Wind-Induced Dynamic Response of High-Rise Buildings

The Effects of Soil-Structure Interaction and a Comparison with the Eurocode Approach

In the Netherlands, there is an increasing need to create residential spaces in its already crowded cities to accommodate the growing population. Constructing high-rise buildings is one way to try to solve the issue. However, high-rise buildings are sensitive to wind-induced vibr ...

The implementation of Arctic ice management

Counteracting the annual Arctic sea ice loss by distributing sea water on top of sea ice

The Arctic is warming more rapidly than other latitudes, which can result in the release of additional greenhouse gasses, global sea level rise and increase in extreme weather events. Additionally, this causes the rapid decline of sea ice and an ice free Arct ...

The offshore wind market is developing fast due to climate change. To ful fil in the growing demand for offshore wind market, one has to look for floating offshore wind solutions as nearshore shallow waters are depleting. Several types of floating wind struct ...

Integrating Sustainable Objectives in Transmission System Operators' Projects

A decision-support framework for the prioritisation and integration of sustainable objectives in projects

One of the ways that Transmission System Operators (TSOs) can become more sustainable is by integrating sustainable goals in their projects using the associated procurement and tender processes. However, there are several limitations related to this integration. This research aim ...

Project Strategy Generation and Visualization Assistant for Schedule Delays

Integrating Evolutionary Algorithm in Lean + BIM Approaches

Projects in the Complex Engineer-to-order (ETO) sector are subjected to frequent schedule delays caused by engineering changes, supply chain delays and fabrication delays. Project organizations are faced with the challenge of realigning the project duration within the pre-determi ...

Re-designing the Vibro-drill for post-installation retrieval

Redesigning the Vibro-drill to include functionalities for retrieval. Report on the design process, structural analysis, the detailed design and recommendations to GBMWorks

With increasing diameters of offshore monopile foundations, impact hammers require more energy per blow in order to drive them into the seabed. This does not only increase the fatigue loading on the monopile, but it also increases underwater noise that affects marine life. The in ...

Sitting Up System

A novel concept for large integrated offshore wind turbine installation

It is expected by the EWEA that in the North Sea only the wind energy capacity will increase to 45 GW. In 2015 the capacity was only 5.2 GW. Offshore contractors should be capable of installing lots of turbines and just that is a problem. As turbines increase in size installation ...
'Construction Knowledge' is the requisite knowledge for effective and efficient construction and its use in project processes across project lifecycle for better constructability is 'Construction Knowledge Integration (CKI)'. Past researches show that there is limited integration ...